Closed
Save

B-2 Engine Auxiliary Inlet Door Performance Based Logistics

Department of Defense (DoD)Sol: SPRHA1-26-R-B2EAID
FFP
est. $15M – $60M

This opportunity is closed

The response deadline has passed. Review the details for future reference or to track similar opportunities.

Quick Brief

The Department of Defense is procuring a Performance Based Logistics (PBL) strategy for the B-2 Engine Auxiliary Inlet Door (EAID) to enhance supply chain efficiencies and improve material availability. The contract aims to establish a long-term support framework that includes comprehensive material support, OEM engineering assistance, and performance metrics to ensure mission readiness and reliability. Key objectives include activating depot capabilities, improving demand planning, and increasing the vendor base to address supply constraints.

Generated 31d ago

Contract Details

Contract Typei
FFP
Estimated Value
est. $15M – $60M
Similar contracts award $2K to $39K (median $9K, 157,421 awards)Above typical range
Period of Performance
10 years
NAICS Codes
Place of Performance
Ogden, UT, USA

Agency & Contact

Contracting Organization

Agency
DEPT OF DEFENSE

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Published1mo ago
Jun 22, 2026
Became Solicitation1mo ago
Jun 23, 2026
Tracked
Last Updated1mo ago
Jun 24, 2026
Response Date3d ago
Jul 22, 202617:00
MDT
Response Due2d ago
Jul 22, 2026

Description

Program: B-2 Main Engine Auxiliary Inlet Door (EAID) Performance Based Logistics (PBL) Strategy Organization: 423rd Supply Chain Management Squadron (SCMS), and 429 SCMS/Enterprise Commodity Council (ECC) Scope The ECC has developed a Cross-Functional Team (CFT) comprised of members of the 423rd SCMS, B-2 AFLCMC Program Office, and 531 CMXG squadron. The B-2 EAID team is seeking information towards developing a PBL support strategy to improve supply chain efficiencies, material availability, and supplier base of the B-2 EAID and its subcomponents. The CFT plans to utilize Key Performance Indicators (KPI) to measure Contractor performance to meet critical goals in support of the warfighter mission.

Background The EAIDs are vital components of the B-2 Spirit and are used to prevent air flow separation to reduce power loss at low aircraft speeds. Ahead of each air intake inlet is a serrated slit-like auxiliary inlet which removes the turbulent boundary layer air, preventing it from entering the engine. This boundary layer air is then mixed with the exhaust to cool its temperature and reduce the infrared signature of the aircraft, part of its low observable system. The B-2 is a multi-role, long-range, high-altitude bomber, capable of flying intercontinental missions without refueling, then penetrating present and predicted sophisticated enemy defenses. Current EAID end-item depot activation and repair constraints are impacting 100% of scheduled aircraft Program Depot Maintenance (PDM). A 100% PDM task to replace EAIDs with serviceable assets was signed in 2017 but has been deferred since 2019. The B-2 Spirit is scheduled to be in service through 2058. Developing Strategy The

objectives of this PBL contract are to: (1) improve and sustain readiness; (2) Improve piece part supportability; (3) Activate, increase throughput, and maximize capability within the OO-ALC depot; (4) Improve demand planning and forecast collaboration, and (5) Gain increased OEM end item and tooling engineering support. Under a performance-based approach, end-item sustainment is managed through integrated packages driven by output performance metrics (availability and reliability) rather than input-based measures. To establish clear accountability, this strategy will be structured under a single product support integrator. Flexible sustainment that incorporates direct vendor delivery, technology insertion, reliability-centered maintenance, process improvement engineering, and public/private partnering will be needed to achieve mission support

objectives outlined above. It is anticipated the performance-based support and measurement will be tracked on an end-item level to include 100% of the material needed to successfully overhaul each B-2 EAID end-item. The CFT seeks to develop a contract that will support the following strategic

requirements: Complete material support for AF/DLA managed items 10-year Long-Term Contract (LTC), fixed price agreement (five-year base with one five-year option) Develop and maintain an accurate Bill of Material (BOM) OEM Engineering, technical, and tooling support Specific incentives/disincentives applied to OEM performance Enhanced and preserved depot workforce Full transparency of AF demands and depot repair

requirements Update technical data procedures and specifications Improve repair/testing processes Repair and restore tooling Improved demand planning & forecast collaboration Increased end-item availability and reliability Increase potential vendor base to alleviate DMSMS constraints As part of this requirement, it is expected the Contractor will accept the responsibility of identifying and developing new (AF engineering approved) sources of manufacture and working with the 423rd SCMS, B-2 AFLCMC Program Office, and 531 CMXG maintenance squadron to ensure all parts are available upon demand. The CFT is asking for feedback from the OEM, Northrop Grumman Corporation (NGC), representatives regarding the performance-based support for the B-2 EAID and components through the construct of a US Air Force (USAF)/DLA contractual relationship. The CFT is looking to NGC to help shape the strategy of this effort through their open comments/feedback on the topics/questions below.

Get matched to contracts like this daily

Free AI-powered contract matching for your business.