The response deadline has passed. Review the details for future reference or to track similar opportunities.
|4|N743.24|WVD|N/A|[email protected]| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014)|1|See specification sections C and E.| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION AND ACCEPTANCE - SHORT VERSION|8|X||X|||||| GENERAL INFORMATION-FOB-DESTINATION|1|B| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Stand-Alone Receiving Report - Certifications Combo - Receiving Report & Invoice - Material |N/A|TBD|N00104|TBD|N39040 - Certifications, S4306A - Material |N50286|TBD|133.2|N/A|N/A|N39040 - Certifications |N/A |N/A|SEE DD FORM 1423 |[email protected]| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WSS MECH| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|One year from date of delivery.|One year from date of delivery.||||| WARRANTY OF DATA-BASIC (DEVIATION 2026-O0035) (FEB 2026)|2||| NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (DEV 2026-O0037)(FEB 2026)|1|| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|||||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2|X|| 1. DD1423 Data Item A001 (Inspection and Test Plan) may be waived if already onfile at NAVSUP WSS Mechanicsburg. 2. Portsmouth NSY's DODAAC has changed from N00102 to N50286. Any reference toN00102 within this order should be updated to N50286. 3. All contractual documents (i.e. contracts, purchase orders, task orders, delivery orders, and modifications) related to the instant procurement are considered to be "issued" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods, such as email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed here in. 4. The following proposed delivery schedule applies: Submission of Certification Data CDRLs will be on or before 20 days prior to scheduled delivery. PNSY review/acceptance of Certification CDRLs 30 working days after receipt of Certification DD 1423 CDRLs. Final delivery of material will be on or before 250 days after effective date of the resulting contract. 5. Any contract awarded as a result of this solicitation will be a DX rated order certified for national defense use under the Defense Priorities and Allocations System (DPAS). 6. If drawings are included in the solicitation, access needs to be requested on the individual solicitation page on Contracts Opportunities on the Government's SAM.gov website. After requesting access, send an email to the Primary POC listed on the solicitation. 7. This order is issued pursuant to Emergency Acquisition Flexibilities (EAF). \ 1. SCOPE 1.1 The material covered in this contract/purchase order will be used in a crucial shipboard system. The use of incorrect or defective material would create a high probability of failure resulting in serious personnel injury, loss of life, loss of vital shipboard systems, or loss of the ship itself. Therefore, the material has been designated as SPECIAL EMPHASIS material (Level I, Scope of Certification, or Quality Assured) and special control procedures are invoked to ensure receipt of correct material. 2. APPLICABLE DOCUMENTS 2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order, however, must supersede applicable laws and regulations unless a specific exemption has been obtained. 2.2 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.2.1 Documents, drawings, and publications supplied are listed under "Drawing Number". These items should be retained until an award is made. 2.2.2 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 2.2.3 Specification Revisions - The specification revisions listed under "Documents References" below are the preferred revision. Older and/or newer r evisions are acceptable when listed within Contract Support Library Reference Number CSD155 in ECDS (Electric Contractor Data Submission) at: ht tps://register.nslc.navy.mil/. This is to allow Contractors to use certain acceptable older specification revisions to purge their existing stock of material certified to those older revisions or to use newer specification revisions when material is certified to newly released revisions,without requiring the submittal of waiver/deviation requests for each specification revision on every contract. Revisions of specifications reflecting editorial and/or re-approval (e.g. E2009, R2014, etc.) are considered inconsequential, but are acceptable when their revisions are listedwithin CSD155 or elsewhere within this contract. DRAWING DATA=6903452 |53711| -| |D| | | | DOCUMENT REF DATA=FED-STD-H28 | | |B |190424|A| | | DOCUMENT REF DATA=FED-STD-H28 |0020| |B |941221|A| |01| DOCUMENT REF DATA=ANSI/ASQ Z1.4 | | | |080101|A| | | DOCUMENT REF DATA=ASTM-B574 | | | |181101|A| | | DOCUMENT REF DATA=MIL-STD-792 | | |F |230223|A| |01| DOCUMENT REF DATA=MIL-STD-2132 | | |D |080310|F| |01| DOCUMENT REF DATA=ISO_9001 | | | |081115|A| | | DOCUMENT REF DATA=ISO10012 | | | |030415|A| | | DOCUMENT REF DATA=ISO/IEC 17025 | | | |050515|A| | | DOCUMENT REF DATA=MIL-DTL-24252 | | |E |061108|A| | | DOCUMENT REF DATA=MIL-I-45208 | | |A |810724|A| 1| | DOCUMENT REF DATA=MIL-STD-45662 | | |A |880801|A| | | DOCUMENT REF DATA=ANSI/NCSL Z540.3 | | | |130326|A| | | DOCUMENT REF DATA=0900-LP-001-7000 | | | |810101|C| |01| DOCUMENT REF DATA=S9074-AQ-GIB-010/248 | | |1 |191112|A| | | DOCUMENT REF DATA=S9074-AR-GIB-010A/278 (CHG A) | | | |130214|A| | | 3.
REQUIREMENTS 3.1 ;Complete cartridge assembly for 2 inch vent check valve to be in accordance with NAVSEA drawing 845-6903452, item 35, except as amplified or modified herein.; 3.2 Material for Parts Requiring Certification - Quantitative chemical and mechanical analysis is required for the parts listed below unless specifically stated otherwise: Part - ;Guide, item 2 (Q3); Material - ;ASTM-B574, UNS N10276; Part - ;Poppet, item 3; Material - ;MIL-DTL-24252, composition 1, condition CA-7; 3.3 Testing Certification - Certifications are required for the following tests on the items listed below. Additional testing on other piece parts (if any) per applicable drawings and specifications is still required, but certifications are only required as listed below. Test - Non-Destructive Tests Item - ;Weld Repair and/or Production Weld (as applicable); Performance - Per applicable fabrication specification Acceptance - Per applicable fabrication specification Test - ;Cartridge Assembly Test; Item - ;Each Cartridge Assembly; Performance - ;General note 5.F of drawing 6903452; Acceptance - ;General note 5.F of drawing 6903452; Test - Ultrasonic Inspection Item - ;Poppet, item 3 (on starting material); Performance - MIL-STD-2132 and MIL-DTL-24252 Acceptance - MIL-DTL-24252 3.4 The pressure tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure tolerances are not provided by drawings, specifications or specified elsewhere in this contract, the following must be used: For pressure tests below 100 PSIG, the pressure tolerance must be +1 PSIG / -0 PSIG. For pressure tests at or above 100 PSIG up to and including 2500 PSIG, the pressure tolerance must be +2% / -0 PSIG rounded off to the nearest multiple of the smallest graduation on an analog test pressure gauge, not to exceed 50 PSIG. For pressure tests above 2500 PSIG, the pressure tolerance must be +2% / -0 PSIG, rounded off to the nearest multiple of the smallest graduation on an analog test pressure gauge, not to exceed 200 PSIG. The pressure test time tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure test time tolerances are not provided by drawings, specifications or specified elsewhere in this contract, the following must be used: For a test duration up to and including 1 hour, the tolerance must be +5 minutes / - 0 minutes. For a test duration of more than 1 hour up to and including 24 hours, the tolerance must be +30 minutes / - 0 minutes. For a test duration of more than 24 hours, the tolerance must be +60 minutes / - 0 minutes. 3.5 ;The original melter, melter/converter and converter of MIL-DTL-24252 material must be qualified in accordance with paragraph 3.2.6 of MIL-DTL-24252.; 3.6 Internal Threads - All internal threads must be formed by cutting. Cold forming of internal threads is not acceptable. 3.7 Thread Inspection
Requirements - All threads on threaded parts must be inspected using appropriate inspection methods, inspection systems, and inspection gages/instruments in accordance with FED-STD-H28 series. Substitution of thecommercial equivalent inspection in accordance with ASME B1 series is acceptable. 3.7.1 System 21 of FED-STD-H28/20 must be used as a minimum inspection requirement for threads when the design drawing or design specification does not specify an inspection requirement. 3.7.2 For Navy and Shipyard drawings, system 21 of FED-STD-H28/20 may be substituted for System 22 without further Navy approval when the design drawing invokes System 22 and does not cite governing specifications that specifically require system 22. System 22 of FED-STD-H28/20 must be used when the drawing references other governing specifications that specifically require System 22, such as certain thread types of MIL-DTL-1222. 3.7.3 A written request for concurrence must be submitted when utilizing alternative measuring equipment or measuring systems not applicable to the specified inspection system. 3.8 O-ring grooves and mating sealing surfaces must be inspected per the contractually invoked drawings or specifications. When the drawings or specifications do not provide specific defect criteria or state that no defects are allowed, the General Acceptance Criteria (GAC) standard must be used for inspecting O-ring grooves and mating sealing surfaces only. Repairs to sealing surfaces and O-ring grooves with unacceptable defects may be accomplished within the limits of the size and tolerances provided in the applicable drawing. Repairs thatwould exceed these limits require approval (including final dimensions). The data that is red lined (crossed out) is excluded from the GAC for this contract and is not to be used for acceptance or rejection criteria. The GAC document is identified as Contract Support Library Reference Number CSD008 at https://register.nslc.navy.mil/ 3.9 Welding or Brazing - When welding, brazing, and allied processes are required, as invoked by Section C paragraph 3
requirements, they must be in accordance with S9074-AR-GIB-010A/278, 0900-LP-001-7000 for brazing of piping and pressure vessel applications, or S9074-AQ-GIB-010/248 for brazing of other applications. For all production and repair welding and brazing, personnel and procedures must be qualified under S9074-AQ-GIB-010/248 or 0900-LP-001-7000, as applicable. Repair welding is not permitted on ;MIL-DTL-24252 material; . Procedures and Qualification Data must be submitted for review and approval prior to performing any welding or brazing. 3.10 NAVSEA 0948-LP-045-7010 - Any applicable
requirements of NAVSHIPS 4410.17,NAVSEA 0948-LP-045-7010, or 0948-045-7010 which the contractor must meet are included in this contract/purchase order. The above documents are for GovernmentUse Only. Further application of the above documents is prohibited.prohibited. 3.10.1 Marking of material with a Material Designator per the Drawing is also prohibited, with the exception of Fasteners. Fasteners must be marked with a Material Symbol/Designator as specified elsewhere in this contract. 3.11 Certificate of Compliance - (SPECIAL EMPHASIS MATERIAL) The Contractor must prepare and submit a certificate of compliance certifying that the items/components furnished under this contract comply with the
requirements of the procurement document, including any/all invoked specifications and drawings. 3.12 Configuration Control - The Contractor must maintain the total equipment baseline configuration. For items of proprietary design, Contractor drawings showing the latest assembly configuration must be provided to the Government in electronic (C4) format. Definitions are provided elsewhere in the Contract/Purchase Order. 3.12.1 Waivers/Deviations - All waivers and deviations, regardless of significance or require review and approval by the
Get matched to contracts like this daily
Free AI-powered contract matching for your business.