The response deadline has passed. Review the details for future reference or to track similar opportunities.
This listing does not include downloadable attachments. The solicitation details may be in the description below.
Verify on SAM.govThe Piegan LPOE Port has water accumulation under the main port building that needs to be mitigated. This will be accomplished by the installation of French drain system around the perimeter of the building foundation footings. French drains once installed will empty into contractor supplied sump pumps to collect water to be pumped out into the storm drain system. A new vapor barrier will be installed to damper any ground source water evaporation from occurring under the building. John Morelion Contracting (No Street Address
2) Washington, DC 20405 USA to this opportunity.
Get matched to contracts like this daily
Free AI-powered contract matching for your business.