Closed
Save

Interior Painting and Lighting Upgrades for Buildings 102 and 110

Department of Defense (DoD) > National Guard Bureau
FFP
est. $15K – $45K

This opportunity is closed

The response deadline has passed. Review the details for future reference or to track similar opportunities.

Quick Brief

The Department of Defense is procuring painting and lighting upgrades for Buildings 102 and 110, which includes painting approximately 2,000 square feet of interior surfaces and replacing incandescent light bulbs with LED bulbs. Contractors must prepare walls and ensure furniture and equipment are protected during the work. This solicitation is set aside for small businesses, and quotes must be submitted electronically by following the provided instructions.

Generated 6d ago

Scope & Requirements

The contractor will perform painting and lighting upgrades in specified buildings, including wall preparation and the installation of LED lighting.

Contract Details

Contract Typei
FFP
Estimated Value
est. $15K – $45K
Similar contracts award $9K to $71K (median $22K, 2,154 awards)Within typical range
NAICS Codes

Qualifications & Eligibility

Set-Aside Category
small business
Required Registrations
  • DBIDS

Agency & Contact

Contracting Organization

Agency
DEPT OF DEFENSE
Sub-Agency
National Guard Bureau

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Site Visit2y ago
Jun 24, 202409:00
Tentatively scheduled; not mandatory but strongly recommended.
Published8d ago
Jul 16, 2026
Last Updated8d ago
Jul 16, 2026
Became Solicitation7d ago
Jul 16, 2026
Tracked
Became Sources Sought7d ago
Jul 17, 2026
Tracked
Response Due3d ago
Jul 21, 2026

Description

This requirement is for painting interior surfaces and upgrade lighting in . Preparatory work will include repairing walls, sanding, and priming. Approximately 2,000 square feet of , and 5,500 square feet of production areas will be painted. The contractor will not be responsible for moving furniture nor equipment, but they must ensure it is protected. The contractor will also be responsible for replacing all interior incandescent light bulbs with LED bulbs Request for Quote (RFQ) details are provided on the attached solicitation. This requirement is being solicited as a small business set-aside. Review the RFQ solicitation instructions for quote submission criteria. Quotes shall be submitted electronically to the following email addresses: [email protected]; [email protected] A site visit is tentatively scheduled for Wednesday 24 June at 0900 PDT. The designated rally point will be the west gate visitor parking lot. Parking space is limited therefore carpooling is strongly advised. To be granted base access, Offerors must complete Defense Biometric Identification System (DBIDS) Prequalification and submit a base access form. Complete all fields under the CONTRACTOR/VENDOR/VISITOR INFORMATION section consisting of attendee names, citizenship, and DBIDS code (6-digit code). The base access form must be provided before the site visit. Refer to Attachment, Base Access Request, for additional instructions.

Questions will be accepted until seven days prior to solicitation response deadline. The site visit is not mandatory but strongly recommended. Offerors are responsible for verifying conditions at the project site. As required by 15 U.S.C. § 644(w), implemented by RFO FAR 36.101-4, the following information is provided to interested small businesses: (A). The National Guard Bureau (NGB) has no agency-specific policies or procedures applicable to definitization of equitable adjustments for change orders under construction contracts, other than those described at FAR 43.204, DFARS 243.204 and Army FAR Supplement (AFARS) 5143.204. (B). Data for the prior 3 fiscal years regarding the time required to definitize equitable adjustments for change orders under construction contracts for the NGB is currently unavailable, however data for Department of the Army (which NGB reports to) is listed below: Selected Agency: DEPT OF THE ARMY Time to definitize after receipt of an adequate Change Order Definitization Proposal under Construction Contracts: Number of Change Order Proposals definitized under Construction Contracts 30 days or less: 0 31 to 60 days: 1 61 to 90 days: 0 91 to 180 days: 0 181 to 365 days: 1 Greater than 365 days: 1 After completion of contract performance via a contract modification addressing all un-definitized equitable adjustments received during contract performance 2 Amendment 1 Issued: Updates have been made to the solicitation. Amendment 0001 must be acknowledged to be considered for award. The SF30 must be acknowledged by completing signature fields at 15a, b, c. Submit the SF30 with your quote. Update 1: RFI

questions have been updated to conform to the SOW. Question one (1) was updated. The following attachment provides current responses: RFI Question and Answers for Bldg. 102, 110, 1-11 (b) Justin Scales Alternative

Point of Contact Jarrod Sanchez to this opportunity. RFI Question and Answers for Bldg. 102, 110, 1-11 (b).pdf Solicitation Amendment W50S6T26QA0270001 SF 30.pdf Statement of Work HAYW262012 - Paint and Lights

25 June 2026.pdf RFI Question and Answers for Bldg. 102,110, 1-11.pdf (deleted) Base Access Request - 144 SFS DVES FORM (20240320).pdf Solicitation - W50S6T26QA027 Professional Appearance.pdf Wage Determination CA20260018 Rev 5

18 May 2026.pdf

Get matched to contracts like this daily

Free AI-powered contract matching for your business.