The response deadline has passed. Review the details for future reference or to track similar opportunities.
The Department of Homeland Security is procuring circuit card assemblies for the U.S. Coast Guard's Surface Forces Logistics Center. The requirement includes specific part numbers and detailed packaging and marking standards, with an emphasis on brand name compliance and programming needs upon installation. Quotations are requested from small businesses, and the contract will be awarded based on the lowest price technically acceptable.
The work involves providing circuit card assemblies that meet specific technical and packaging requirements for the U.S. Coast Guard.
after date offers due HOMELAND SECURITY, DEPARTMENT OF US COAST GUARD (00080) Total Small Business ND ELECTRONIC ASSEMBLIES, BOARDS, CARDS, AND ASSOCIATED HARDWARE puter and Peripheral Equipment Manufacturing The United States Coast Guard Surface Forces Logistics Center has a requirement and requesting quotations for the following part: Item
1) 5998 01-621-5133 SIEMENS BUILDING TECHNOLOGIES PART NUMBER: P/N POL688.10/STD QTY: 20 ORIGNAL PART NUMBER HAS BEEN DISCONTINUED ONCE THERE ARE NO MORE AVAILABLE USE REPLACEMENT PART NUMBER P/N POL688.10/STD , CLIMATIX POL688.10/STD HVAC CONTROLLER; 24 VAC/DC; 27 I/O; ETHERNET, RS485, KNX; MODBUS, BACNET, PL-LINK, JSON, OPC UA; SD CARD; USB THESE UNITS ARE NOT PROGRAMMED AND WILL NEED TO BE PROGRAMMED BY THE VESSEL OR ASSIST PERSONNEL AT TIME OF INSTALLATION. INDIVIDUALLY PACKAGED IN ACCORDANCE WITH MIL-STD-2073-1E METHOD 41, INITIALLY WRAPPED IN ELECTROSTATIC DISCHARGE PROTECTIVE MATERIAL CONFORMING TO MIL-PRF-81705E, TYPE III. EACH ITEM SHALL THEN BE PACKAGED IN A FAST PACK CONTAINER CONFORMING TO PPP-B-1672E, TYPE II, STYLE
D. MARKING IAW MIL-STD-129R EXCEPT BAR CODED IAW ISO/IEC-16388-2007, CODE 39 SYMBOLOGY. ALL MARKINGS SHALL BE PLACED SO VISIBLE BY FORKLIFT OPERATOR, IF APPLICABLE. ALL ITEMS ARE INSPECTED WHEN DELIVERED TO THE COAST GUARD WAREHOUSE. FAILURE TO MEET THE
REQUIREMENTS FOR PACKAGING, PACKING, MARKING (PP&M) AND BAR-CODING WILL RESULT IN THE ITEM(S) BEING REJECTED AND POSSIBLY RETURNED TO THE VENDOR. THIS WILL DELAY PAYMENT. ANY
Get matched to contracts like this daily
Free AI-powered contract matching for your business.