The response deadline has passed. Review the details for future reference or to track similar opportunities.
The project involves the repair of a damaged public boat ramp at the Port Louisa National Wildlife Refuge, specifically replacing the existing concrete ramp. The work is required to ensure safety for users of the Mississippi River and must be monitored weekly by refuge staff.
The contractor will remove the existing concrete boat ramp and replace it with a new concrete ramp to address safety hazards.
IA-Port Louisa NWR Boat Ramp Project.
Remove existing concrete boat ramp,and replace with new concrete boat ramp.Seeking contractors to repair a damaged and degraded public boat ramp to the Mississippi River from the Louisa Division of the refuge.
With river levels low, refuge staff have determined that previously-identified concrete degradation of a section of the ramp is accelerating and presents a property hazard to users of the river that must be monitored by refuge staff on a weekly basis to ensure its continued use.Site Visit- March 11, 2026, 9:00 AM CST, email Nathan Barnett, [email protected], or call, (636)474-9749, no later than 24 hours prior to the site visit.Questions- March 12, 2026, emailed to Bill Koski, [email protected] Due- March 20, 2026, at 3:00 PM EST, to emailed to Bill Koski, [email protected] Koski, William Contracting , Construction A/E Team 2 5275 Leesburg Pike Falls Church, VA 22041 USA to this opportunity.
Sol_140FC226Q0014.pdf
Get matched to contracts like this daily
Free AI-powered contract matching for your business.