Closed
Save

Annual Inspection and Testing of Backflow Preventers for Base Ketchikan Potable Water System

Homeland Security (DHS) > U.S. Coast GuardSol: 70Z03526QKETC002
SBFFP
$13K – $126K per task order

This opportunity is closed

The response deadline has passed. Review the details for future reference or to track similar opportunities.

Quick Brief

The Department of Homeland Security is contracting for annual inspection, testing, and certification of the potable water system backflow preventers at the U.S. Coast Guard Base Ketchikan. The contractor will provide all necessary personnel, labor, materials, and equipment to ensure compliance with federal and local regulations, maintaining system integrity and safety. This procurement is set aside for small businesses under the Plumbing, Heating, and Air-Conditioning Contractors NAICS code.

Generated 27d ago

Scope & Requirements

The contractor will perform annual inspections, testing, certification, and reporting for all backflow prevention assemblies at the U.S. Coast Guard Base Ketchikan.

Contract Details

Contract Typei
FFP
Contract Value
$13K – $126K per task order
IDIQ ceiling: $19M
Similar contracts award $13K$126K (median $35K, 14,862 awards)
NAICS Codes
Set-Asides
SB

Qualifications & Eligibility

Set-Aside Category
Total Small Business
NAICS Size Standard
$19.0M

Agency & Contact

Contracting Organization

Agency
HOMELAND SECURITY, DEPARTMENT OF
Sub-Agency
US Coast Guard

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Published28d ago
May 7, 2026
Became Solicitation27d ago
May 7, 2026
Tracked
Last Updated26d ago
May 9, 2026
Response Due7d ago
May 27, 2026

Description

This solicitation for commercial services is prepared in accordance with the format in Federal Acquisition Regulation (FAR) subpart 12.201, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested and a written solicitation will not be issued. The U.S. Coast Guard (USCG) Base Ketchikan has a requirement for annual inspection, testing, and certification for its potable water system backflow preventers. The contractor shall provide all personnel, labor, materials, equipment, tools, supervision, and transportation necessary to perform the work as detailed in the attached Performance Work Statement (PWS). This procurement is a total small business set-aside under NAICS Code: 238220 - Plumbing, Heating, and Air-Conditioning Contractors. The small business size standard is $19.0 million. (The full) Performance Work Statement is attached to this solicitation package and provided below: Base Ketchikan Potable Water System Backflow Preventer – Annual Inspection and Testing 1.0 GENERAL 1.1

Background: United States Coast Guard (USCG) Base Ketchikan requires annual inspection, testing, and certification for its potable water system backflow preventers to ensure compliance with federal and local regulations, maintain system integrity, and protect the health and safety of base personnel. 1.2 Scope: The Contractor shall provide all necessary equipment, labor, materials, and supervision to perform annual inspection, testing, certification, and reporting for all backflow prevention assemblies listed in this PWS. This is a non-personnel services contract. The Government will not exercise any supervision or control over the contract service providers. 1.3

Objective: The

objective of this contract is to ensure all backflow prevention assemblies at USCG Base Ketchikan are functioning correctly, are certified in accordance with all applicable standards, and that any deficiencies are documented and reported to the Government for corrective action. 1.4 Applicable Documents: Manufacturers’ Specifications for each backflow preventer. Ketchikan Municipal Code. NFPA 25: Standard for the Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems. 2.0 SPECIFIC

REQUIREMENTS/TASKS The Contractor shall perform the following tasks for all backflow preventers listed in Paragraph 2.1. 2.1 Task One: Inspection and Testing. The Contractor shall conduct annual inspection and testing on all backflow prevention assemblies listed below. 2.1.1 Equipment List: | Location | Brand | Size | | Hard Pier | Watts 909 | 2.5" | | Hard Pier | Watts 909 | 2.5" | | Hard Pier | Watts 909 | 2.5" | | IPF North Shop | Watts 909 M1 QT | 2" | | IPF North Shop | Watts 909 M1 QT | 2" | | IPF Boiler Room | Watts 007M3 QT | 3/4" | | STA Boat House | Watts 909 M1 QT RP | 1.5" | | STA Boat House | Watts 009 QT RP | 3/4" | | Admin Boiler Room | FEBCO 825Y | 1" | | North Shop Industrial | Watts 007 M1 QT | 2" | | Warehouse Boiler room | FEBCO | 1.5" | | MAT Boiler Room | AMGS COLT 200 DC | 6" | | Medical Boiler | Watts LF 009 M2 QT | 1.5" | | Medical Boiler | Watts LF 009 M3 QT | 3/4" | | Galley Boiler | Watts LF 009 M2 QT | 1" | | UPH Boiler | Watts LF 009 M3 QT | 3/4" | | FRC Pier Supply | Watts | 4" | | Hard Pier #3 | Watts | 2.5" | | Lower Base Main | Wilkins | 6" | | ADMIN Sprinkler | AMES | 6" | | PIER #2 | Watts | 1.5" | | Lower Station Boat House | Watts | 2" | 2.2 Task Two: Reporting. The Contractor must provide a detailed report of the work performed. 2.3 Task Three: Deficiency Quoting. For any assembly that fails inspection or is found to be deficient, the Contractor must provide a written quote for the necessary repairs. 3.0 CONTRACTOR PERSONNEL 3.1 Qualified Personnel: The Contractor must provide certified and qualified personnel to perform all

requirements specified in this PWS. The Contractor must provide proof of technician certification/license to the Technical POC (POC) upon request and include it with the final report deliverable. 4.0 OTHER APPLICABLE CONDITIONS 4.1

Get matched to contracts like this daily

Free AI-powered contract matching for your business.