Closed
Save

Electrical Work at US Coast Guard Ketchikan Base, Department of Homeland Security

Homeland Security (DHS)
est. $5.0M – $45M

This opportunity is closed

The response deadline has passed. Review the details for future reference or to track similar opportunities.

Quick Brief

The US Coast Guard is procuring electrical inspection, maintenance, and repair services for the electrical systems associated with Floating Pier One at Base Ketchikan. Key requirements include inspecting and maintaining shore tie terminals and electrical lines, with deliverables including a written inspection report and documentation of test results. The work must comply with applicable electrical codes and safety standards.

Generated 61d ago

Scope & Requirements

The contractor will provide inspection, maintenance, and repair services for electrical systems at Floating Pier One, focusing on shore tie terminals and electrical lines.

Deliverables

  • Written inspection report detailing findings, repairs performed, and recommendations for future maintenance
  • Documentation of Megger test results and any corrective actions taken
  • Photographic evidence of before and after conditions for all work performed

Contract Details

Contract Value
est. $5.0M – $45M
Similar contracts award $13K$136K (median $40K, 9,578 awards)Above typical range
for repairs in the shore tie terminal box
Period of Performance
2 weeks for shore tie terminal inspection and maintenance, 3 weeks for electrical line inspection and grooming, 1 month for final report
NAICS Codes
Place of Performance
Ketchikan, AK, USA

Agency & Contact

Contracting Organization

Agency
HOMELAND SECURITY, DEPARTMENT OF
Sub-Agency
Department of Homeland Security

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Published4mo ago
Feb 17, 2026
Last Updated4mo ago
Feb 17, 2026
Became Solicitation4mo ago
Feb 17, 2026
Tracked
Bid Due Date3mo ago
Feb 26, 202615:00
Alaska Time Zone
Response Due3mo ago
Mar 17, 2026

Description

Scope of Work: Electrical Inspection and Maintenance – Floating Pier One, Base Ketchikan 1.

Objective: Provide inspection, maintenance, and repair services for electrical systems associated with Floating Pier One, Base Ketchikan, with a focus on shore tie terminals and associated electrical lines. 2. Location: Floating Pier One, Base Ketchikan. Berth 5 3. Tasks:

A. Shore Tie Terminal Maintenance Inspect all shore tie terminals where vessels connect to shore power. Identify and document any damage, corrosion, moisture intrusion, or other deficiencies. Repair any identified issues to restore full functionality. Dry and seal all shore tie terminals to prevent future moisture intrusion. Test terminals for proper operation after repairs and sealing.

B. Electrical Line Inspection and Grooming Inspect the electrical line running from the FRC Floating Pier Isolation Transfer to the shore tie terminals. Clean and groom all accessible portions of the line, removing debris, corrosion, and contaminants. Conduct a thorough inspection for physical damage, wear, or potential failure points. Perform Megger (insulation resistance) testing on the electrical lines to identify any insulation breakdowns or other potential issues. Document all findings and provide recommendations for further action if required. 4.

Deliverables: Written inspection report detailing findings, repairs performed, and recommendations for future maintenance. Documentation of Megger test results and any corrective actions taken. Photographic evidence of before and after conditions for all work performed. 5.

Period of Performance: Shore Tie Terminal inspection and maintenance shall be completed within two (2) weeks from award of contract. Electrical line inspection, grooming, and cleaning shall be completed within three (3) weeks from award of contract. Final written report of findings and actions written(typed) and documented shall be submitted within one (1) month from the start of the

Get matched to contracts like this daily

Free AI-powered contract matching for your business.