The Department of Defense is contracting for the construction of an aircraft parking apron at Andersen Air Force Base in Guam. This project includes associated taxiways, utility yards, airfield fencing, and hydrant fueling pits to support various aircraft operations. Key requirements involve extensive groundwork, drainage, airfield lighting, and other necessary airfield support features.
Get your fit score, win probability, and required capabilities.
The project involves constructing an aircraft parking apron with necessary support infrastructure at Andersen Air Force Base.
The project is to construct an aircraft parking apron with associated taxiways and shoulders, utility yards, airfield fence, and hydrant fueling pits and piping required to accommodate bombers, tankers, and other aircraft. Work should include all subgrade and subbase work, drainage, airfield lighting, grounding, mooring, markings, fencing, ramp area lighting, and other necessary airfield support. Adele Murakami Alternative
Point of Contact Melodie Koike Contracting (No Street Address
2) JBPHH, HI 96860-3134 USA to this opportunity. 26R1300_Note7.pdf 1-N6274226R1300_Amd0003.pdf 2-P012_Amend0003_Specs.pdf 3-P012_Amend0003_Dwgs_Signed.pdf 26R1300_Note6-Final.docx.pdf 0_N6274226R1300_Amd0002.pdf 1_P012_Specs-Amend0002.pdf 2_P012_Amend.0002_Dwgs-Signed.pdf 3_P012_NorthAircraftRamp_RefDwgs-Amend0002.pdf 26R1300_Note5.pdf 26R1300_Note4.pdf N6274226R1300-Amendment 0001.pdf 26R1300_Note3.pdf 26R1300_Note2.pdf 26R1300_Note1.pdf 0-N6274226R1300-FrontEnd.pdf 1-P012_Spec-Final_Signed.pdf 2-P012_DwgsPt1_G001-BB103.pdf 3-P012_DwgsPt2_BB104-CD107.pdf 4-P012_DwgsPt3_CD108-CS312.pdf 5-P012_DwgsPt4_CS501-CG140.pdf 6-P012_DwgsPt5_CG141-CF201.pdf 7-P012_DwgsPt6_CF202-EK502.pdf
Get matched to contracts like this daily
Free AI-powered contract matching for your business.