The Department of the Interior's Bureau of Reclamation is procuring turbine repair services for the Nathaniel Nat Washington Power Plant at Grand Coulee Dam. The project requires the construction of temporary scaffolding to access and repair turbine runners and stay vanes through welding, grinding, and coating.
Get your fit score, win probability, and required capabilities.
Repair of turbine runners and stay vanes including scaffolding construction, inspection, weld preparation, welding, grinding, and coating.
Work is located at Grand Coulee Dam in Okanogan County, Washington.Principal components of work to be performed include work necessary to access and repair turbine runners and stay vanes in the Nathaniel Nat Washington Power Plant, including construction of temporary scaffolding, inspection, weld preparation, welding, grinding, and coating. Fleming, Lance Contracting (No Street Address
2) BOISE, USA to this opportunity. Sol_140R1026B0004_Amd_0004.pdf Final_Q_A_0004.pdf Sol_140R1026B0004_Amd_0003.pdf Sol_140R1026B0004_Amd_0002.pdf J_6_GCPO_Health_Program_Binder__0002.pdf J_5_Forms_Binder__0002.pdf IFB_Solicitation_140R1026B0004_-Conformed_AMD_2_0002.pdf 140R1026B0004_AMD_0002_SF30_0002.pdf Sol_140R1026B0004_Amd_0001.pdf C06_01_WPP_Turbine_Repair_Site_Visit_Sign_In_0001.pdf Sol_140R1026B0004.pdf J_4_Specifications_062026.pdf J_2_SF24_Bid_Bond_Rev_Oct_2023_(4_Pages).pdf J_3_140R1026B0004_Drawings.pdf J_1_DBA_WD___WA20260054_dtd_01232026_Okanogan_County__WA_(7_Pages).pdf
Get matched to contracts like this daily
Free AI-powered contract matching for your business.