Irving Peak Lodgepole and Ninemile Crossing Construction Services

USDA > U.S. Forest ServiceSol: 1240BJ26Q0011
SBFFP
$32K – $473K per task order
Quick Brief

The Department of Agriculture is procuring engineering services for the construction of road bridges over Lodgepole Creek and Ninemile Creek as part of the Irving Peak Lodgepole and Ninemile Crossing project. Key requirements include construction survey and staking, erosion control, dewatering, removal of existing culverts, and installation of new concrete structures, along with site restoration after construction. This project is set aside for small business concerns with a size standard of $45 million.

Generated 24d ago

Can you win this contract?

Get your fit score, win probability, and required capabilities.

Fit Score7/10Consider

Scope & Requirements

The work involves upgrading undersized culverts to road bridges, including construction survey, erosion control, and installation of concrete structures.

Contract Details

Contract Typei
FFP
Contract Value
$32K – $473K per task order
IDIQ ceiling: $45M
Similar contracts award $32K to $473K (median $130K, 7,685 awards)
NAICS Codes
Set-Asides
SB

Qualifications & Eligibility

Set-Aside Category
Total Small Business Set-Aside
NAICS Size Standard
$45 million

Agency & Contact

Contracting Organization

Agency
AGRICULTURE, DEPARTMENT OF
Sub-Agency
FOREST SERVICE

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Published26d ago
Jun 29, 2026
Became Solicitation25d ago
Jun 29, 2026
Tracked
Last Updated23d ago
Jul 1, 2026
Response Dueyesterday
Jul 23, 2026

Description

The Forest Service is seeking engineering services for construction work associated with upgrading undersized culverts to road bridges over Lodgepole Creek and Ninemile Creek along the Little Wenatchee Road (Forest Road 6500).

Work on this contract is anticipated to include, but is not limited to, construction survey and staking, developing and implementing an erosion control plan and a dewatering plan to include conducting fish salvage, removing and disposing of existing culvert and footings, road and channel excavation, reconstructing a steam channel, furnishing and installing a prestressed concrete slab bridge and precast concrete abutments, furnishing and installing a prestressed concrete bulb tee bridge and cast in place micro piles and pile cap, re-grading, reconstructing and repaving of roadway approaches, supplying and installing permanent traffic control features, and restoring and re-planting the site after construction is complete.

The contractor shall furnish all labor, materials, equipment, tools, transportation, and incidental supplies necessary to perform all work described in accordance with drawings and specifications of the contract.

This is a combined for commercial items prepared in accordance with the format in FAR Part 12.

This announcement constitutes the only solicitation.

Quotations are being requested and a separate written solicitation will not be issued.