The response deadline has passed. Review the details for future reference or to track similar opportunities.
The National Oceanic and Atmospheric Administration is replacing an 80-ton chiller at its facility in Port Orchard, Washington, to ensure reliable climate control for critical operations. The work requires installation of a new energy-efficient system compliant with current building codes and minimal disruption to ongoing activities.
Replacement of an existing 80-ton chiller system with a new, energy-efficient unit at NOAA's Port Orchard facility, including removal of the old equipment, installation of the new system, and connection to existing building controls.
No description available
Get matched to contracts like this daily
Free AI-powered contract matching for your business.