The Department of Veterans Affairs is contracting for the repair of deficiencies in Parking Garage 1 at the Oklahoma City VA Medical Center. The contractor will be responsible for providing all necessary equipment, materials, labor, and supervision to address various issues including ADA compliance, parking striping, and the installation of a new stairwell. The project must adhere to strict safety and quality control standards and is expected to be completed within 270 calendar days after the Notice to Proceed.
Get your fit score, win probability, and required capabilities.
The contractor will address defects and deficiencies in Parking Garage 1, including compliance with ADA standards and installation of safety features.
Project 635-21-139, Repair Parking Garage 1 Deficiencies
OBJECTIVE: The purpose of the project is to address the defects and deficiencies of the existing Parking Garage 1. The contractor shall furnish all equipment, materials, labor, supervision, and quality control to perform work for VA Project 635-21-139 Repair Parking Garage 1 Deficiencies located East of the VA Medical Center main building at the corner of NE 13th street and N. Kelly Avenue, Oklahoma City, Oklahoma 73104.
SCOPE OF WORK: This summary is not intended to be all inclusive and does not absolve the contractor of responsibility to address the defects and deficiencies of the Parking Garage 1 consistent with the contents of the specs and/or drawings. Bidders are responsible for the entirety of the project scope described in the contract documents (drawings and specifications) and shall submit RFI s on any conflicts between drawings and specifications immediately that may impact bids. Bidders are responsible for all work specified or shown in the bid documents including the Statement of Work, Drawings, and Specifications. Work includes but is not limited to the following: Parking striping and signage, fixing a sidewalk that is not ADA compliant, installing suicide prevention, providing a new stairwell on the south side of the parking garage. Civil, architectural, electrical, lighting, wayfinding, low voltage, and structural systems are included in this project. The contractor shall comply with all
requirements listed in the project solicitation including the construction drawings, the project specifications, and all solicitation amendments as may be issued. These documents will be followed during construction and shall be considered project
requirements. The areas adjacent to the proposed addition shall be continuously occupied by the OKC VAMC. The Contractor shall implement phasing to ensure that the construction will not impact or impede the VAMC s mission to care for the Veterans. The contractor shall provide quality control of all work conducted and the individual appointed shall be competent and educated/experienced in the field of work this scope encompasses. Codes and Standards: The Contractor shall follow all applicable codes and standards to this type of work including but not limited to Health Care System Memorandums (HCSM), OSHA Guidelines, NFPA 101, NFPA 70, Lock-out-Tag-out, and Rules of Station.
Period of Performance: 270 calendar days after Notice to Proceed (NTP). Task Management: Engineering shall identify a