ActiveOpen for Bids
Save

Rocket Missile Maintenance Facility Precision Strike Missile System And ACP

Department of Defense (DoD) > U.S. Army > Engineer Division North Atlantic District Baltimore
FFP
est. $1M – $5M
Quick Brief

The Department of Defense is procuring construction services for the Rocket Missile Maintenance Facility at Letterkenny Army Depot. The project involves the design and construction of a 45,000 SF maintenance facility, a 10,000 SF storage building, and a 1,600 SF access control point, along with associated site development and infrastructure improvements. Key requirements include earthwork, fencing, roadways, and facilities for munitions loading and unloading.

Generated 12d ago

Can you win this contract?

Get your fit score, win probability, and required capabilities.

Fit Score7/10Consider

Scope & Requirements

The project consists of the design and construction of a new Rocket Missile Maintenance Facility and Access Control Point at Letterkenny Army Depot, including site development and infrastructure improvements.

Contract Details

Contract Typei
FFP
Estimated Value
est. $1M – $5M
Similar contracts award $25K$400K (median $99K, 73,582 awards)Above typical range
NAICS Codes
Place of Performance
Chambersburg, PA, USA

Agency & Contact

Contracting Organization

Agency
DEPT OF DEFENSE
Sub-Agency
US Army Corps of Engineers
Office
Engineer Division North Atlantic District Baltimore

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Site Visit1mo ago
Apr 22, 2026
Attendance Mandatory
RFI Submission Deadline24d ago
May 11, 202611:00 AM EDT
Published13d ago
May 22, 2026
Last Updated13d ago
May 22, 2026
Became Solicitation13d ago
May 22, 2026
Tracked
Became Presolicitation13d ago
May 22, 2026
Tracked
Proposal Due Date3d ago
Jun 1, 2026
Response Duein 18d
Jun 22, 2026

Description

Amendment 0005: Provides spec changes, updated wage determination and factor clarifications. The proposal due date remains unchanged at this time, due

1 June 2026.Amendment 0004:

A. Remove Subsection b. File Packaging from Section 2. Proposal Files from CSI 00 21 16 Instructions to Proposers. The requirement for all proposals to be submitted via a zip file has been removed.

B. Replace the entirety of Specification 01 33 29 in Specification Section 01 33 29 Sustainability

Requirements and Reporting.

C. Replace Paragraph 2.18.1 in Specification 28 31 76, Paragraph 2.18.1.

Get matched to contracts like this daily

Free AI-powered contract matching for your business.