HVAC System Renovation Using Variable Refrigerant Volume/Flow Technology

State DepartmentSol: PR15989443
FFP
est. $97K – $14.8M

This opportunity is closed

The response deadline has passed. Review the details for future reference or to track similar opportunities.

Quick Brief

The Department of State is procuring renovation services for an HVAC (VRV/VRF) system at the Recreation Center Clubhouse located at 75, Gregory's Road, Colombo 7. Key requirements include providing all necessary labor, materials, and equipment to design, install, and commission the system, along with a minimum two-year warranty. The contractor must have a local presence in Sri Lanka and provide qualified on-site supervision throughout the project duration.

Generated 27d ago

Scope & Requirements

The contractor will design, supply, install, test, and commission a complete HVAC system for the Recreation Center Clubhouse, ensuring compliance with applicable codes and standards.

Contract Details

Contract Typei
FFP
Estimated Value
est. $97K – $14.8M
Place of Performance
Colombo, Sri Lanka

Agency & Contact

Contracting Organization

Agency
STATE, DEPARTMENT OF

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Published28d ago
May 7, 2026
Published Date28d ago
May 7, 2026
Became Solicitation28d ago
May 7, 2026
Tracked
Last Updated26d ago
May 9, 2026
Pre-Proposal Conference23d ago
May 12, 202610:15
Mandatory
Quotations Due13d ago
May 22, 202617:30
Response Due13d ago
May 22, 2026

Description

Dear Prospective Offeror: Subject: Request for Quotes 19CE2026Q0010 Enclosed is a Request for Quotes (RFQ) for Renovation - Renovation - HVAC (VRV/VRF) System at 75, Gregory's Road Col 7. If you would like to submit a quotation, follow the instructions in Section J of the solicitation, complete the required portions of the attached document, and submit it to the address shown on the Standard Form that follows this letter. Provide all labor, materials, equipment, and supervision to design, supply, install, test, and commission a complete HVAC (VRV/VRF air conditioning and mechanical ventilation) system for the Recreation Center Clubhouse, serving an average occupancy of 120 persons. Scope includes indoor and outdoor units, refrigerant piping with specified insulation, condensate drainage, fresh air integration, ducted exhaust systems, controls, electrical coordination, and all incidental works required for full functionality. Contractor shall verify design adequacy, reconcile drawings with site conditions, and execute all necessary adjustments to meet performance

requirements. Work shall comply with applicable codes and standards, include TAB and commissioning, and deliver a fully operational system. Provide a minimum two-year warranty (or manufacturer’s longer warranty) covering all parts and labor at no cost to the Government

Attachments Attachment 1 Statement of Work Attachment 2 Electrical Drawings Note: The drawings will be made available only to attendees at the mandatory/pre-proposal site visit and conference. No drawings will be distributed electronically. The U.S. Government intends to award a contract/purchase order to the responsible company submitting an acceptable offer at the lowest price. We intend to award a contract/purchase order based on initial proposals, without holding discussions, although we may hold discussions with companies in the competitive range if there is a need to do so. Quotations are due by 1700 hours 22nd May 2026. No quotations will be accepted after this time. Quotations must be in English and incomplete quotations will not be accepted. The Embassy intends to conduct a pre-proposal conference at No. 75, Gregory’s Road, Colombo 7, at 10:15 a.m. on 12th May 2026. Prices should be duty free and VAT exempt. Both quotation and technical proposal should be submitted and addressed to:

Contracting Officer, American Embassy Colombo, 210 Galle Road, Colombo 03, Sri Lanka Email: [email protected] In order for a quotation to be considered, you must also complete and submit the following: 1. SF-18 2. Section A,

Pricing 3. Section L Representations and Certifications 4. Additional information as required in Section J Local Execution, Responsiveness, and On-Site

Requirements To ensure timely execution, quality assurance, and effective project coordination, the following mandatory