Closed
Save

Annual Utility Tunnel Safety And Health Audits

Architect of the CapitolSol: AOCACB26R0034
est. $24K – $307K

This opportunity is closed

The response deadline has passed. Review the details for future reference or to track similar opportunities.

Quick Brief

The Architect of the Capitol is procuring annual safety and health audits for the utility tunnels associated with the US Capitol Power Plant. The audits will assess compliance with safety and health regulations, identify areas of non-compliance, and document any changes in tunnel conditions, including potential failures. The audits must be conducted by qualified professionals, including a Certified Industrial Hygienist and Mechanical and Electrical Engineers.

Generated 23d ago

Scope & Requirements

The work involves conducting safety and health audits of the utility tunnels to ensure compliance with regulations and to document current conditions.

Deliverables

  • Audit Report
  • Digital photographs

Attachments

No files on SAM.gov

This listing does not include downloadable attachments. The solicitation details may be in the description below.

Verify on SAM.gov

Contract Details

Estimated Value
est. $24K – $307K
Similar contracts award $24K$305K (median $89K, 11,390 awards)Within typical range
NAICS Codes
Place of Performance
Washington, DC, USA

Agency & Contact

Contracting Organization

Agency
ARCHITECT OF THE CAPITOL

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Published24d ago
May 11, 2026
Became Solicitation24d ago
May 11, 2026
Tracked
Last Updated22d ago
May 13, 2026
Response Date9d ago
May 26, 202617:00
Response Due8d ago
May 26, 2026

Description

The

objective of the Audit is to inform US Capitol Power Plant (CPP) management regarding the current conditions and operational practices within the utility tunnels in terms of safety and health compliance to local, state, and federal regulations. The Audit shall identify and document all current areas of non-compliance. Findings shall address condition changes as related to past reports, new deterioration or safety concerns, and the probable cause. The report shall also identify if there is a potential for tunnel or pipe failure or other imminent concerns. The report shall also address noted changes in the condition of the tunnel as it relates to past reports or audits, including but not limited to the acceleration of concrete spalling de-laminations, cracks, damages to pipe insulation, and conditions of electrical conduits. The Audit Report shall contain digital photograph(s). Health and Safety Audits shall be completed under the direction of a Certified Industrial Hygienist and/or Safety Specialist, and Mechanical and Electrical Engineer(s). Marcus Sims Contracting & D Streets, SW FHOB - Room 264 Washington, DC 20515 USA to this opportunity.

Get matched to contracts like this daily

Free AI-powered contract matching for your business.