Closed
Save

Disaster Resiliency Program Phase 3 at Creech AFB, NV

Department of Defense (DoD) > U.S. Army > US ARMY CORPS OF ENGINEERS ENGINEER DIVISION SOUTH PACIFIC ENDIST LOS ANGELESSol: W912PL26S0014
8(a)HUBZonefirm fixed price
$25K – $400K per task order

This opportunity is closed

The response deadline has passed. Review the details for future reference or to track similar opportunities.

Quick Brief

The U.S. Army Corps of Engineers is seeking information for the design and construction of an Aircraft Heavy Maintenance Hangar and a Logistics Warehouse Facility at Creech AFB, NV. Key requirements include reinforced concrete foundations, structural steel frames, and security systems.

Generated 57d ago

Scope & Requirements

Design and construct a 25,300 square foot Aircraft Heavy Maintenance Hangar and a 43,340 square foot Logistics Warehouse Facility, including associated infrastructure and security systems.

Deliverables

  • Reinforced concrete foundations and floor slabs
  • Structural steel frames
  • Metal panel with brick veneer exteriors
  • Standing seam metal roofs
  • Security systems including fences, gates, IDS, ACS, and CCTV
  • Site preparation, storm water management, utilities, and airfield pavements

Contract Details

Contract Type
firm fixed price
Contract Value
$25K – $400K per task order
IDIQ ceiling: $100M
Similar contracts award $25K$400K (median $99K, 73,582 awards)
NAICS Codes
Place of Performance
Creech AFB, NV, USA
Set-Asides
8(a), HUBZone

Agency & Contact

Contracting Organization

Agency
DEPT OF DEFENSE
Sub-Agency
DEPT OF THE ARMY
Office
US ARMY CORPS OF ENGINEERS ENGINEER DIVISION SOUTH PACIFIC ENDIST LOS ANGELES

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Response Due6mo ago
Dec 5, 2025
Published2mo ago
Mar 27, 2026
Last Updated2mo ago
Mar 27, 2026
Became Award Notice2mo ago
Mar 27, 2026
Tracked
Response Date1mo ago
Apr 24, 202612:00 AM
PDT

Description

This is a SOURCES SOUGHT NOTICE for information only. Replies by interested parties will be used by this agency for preliminary planning purposes. No proposal or contract will be awarded from this notice. No reimbursement will be made for any costs associated with providing information in response to this notice or any follow up information requests. The U. S. Army Corps of Engineers has been tasked to solicit and award a firm fixed price contract to design and construct an Aircraft Heavy Maintenance Hangar, Logistics Warehouse Facility and airfield pavements at Creech AFB, NV. Project Scope: Design and construct a 25,300 square foot Aircraft Heavy Maintenance (MX) hanger, a 43,340 square foot Logistics Supply Warehouse and associated infrastructure to support the DRP mission-sets. The Logistics Warehouse is a high-bay facility with shipping and receiving dock and exterior roll-up metal coil doors for the movement of equipment to and from the flightline. The facility will be constructed with reinforced concrete foundation/floor slab, structural steel frame, metal panel with brick veneer and standing seam metal roof. The MX hangar will consist of (2) bays with horizontal sliding pocket doors and will be constructed with reinforced concrete foundation/floor slab, structural steel frame, metal panel with brick veneer exterior, and standing seam metal roof system. Hanger Bay 1 will contain a 15 Ton bridge crane. The hangar will also include anti-skid hangar floor coating, installation of a water sprinkler first suppression system, aircraft static grounding points, and adequate exhaust and ventilation systems. A pre-engineered metal building system (MBS) can be used for the Hangar Maintenance Facility and Logistics Warehouse. The facilities security system will include security fences, gates, an intrusion detection system (IDS), access control system (ACS), and closed-circuit television (CCTV) as well as cybersecurity measures for facility-related systems. Supporting facilities include all site preparation, storm water management, electrical, airfield lighting, communications, water and sewer utilities and connection fees, water storage tanks, fire detection and suppression systems. The Logistics Warehouse and Hangar will meet DOD

Requirements and security protocols for secure work areas with security sensors and alarms. Facilities will be designed as permanent construction in accordance with the DoD Unified Facilities Criteria (UFC) 1-200-01, General Building

Requirements, UFC 1-200-02, High Performance and Sustainable Building

Requirements, UFC 4-211-01, Aircraft Maintenance Hangars, UFC 3-260-02, Pavement Design for Airfields, and other UFCs as appropriate. The facility should be compatible with applicable DoD, Air Force, and base design standards. In addition, local materials and construction techniques shall be used where cost effective. This project will comply with DoD antiterrorism / force protection

requirements per unified facilities criteria. Special Construction

Requirements: Secure work areas specifications and construction in accordance with ICD/ICS 705 is necessary for mission-essential primary facilities. Minimum Capabilities Required Include the Following: Work includes the design construction and installation of: reinforced concrete foundations, concrete floor slab, structural steel frame, concrete masonry units, insulated metal panel systems, gypsum wallboard, and a combination single ply membrane/standing seam metal low slope roof, utilities; communications support; site improvements and hardscapes; airfield pavements; electrical systems; heating, ventilation, and air conditioning systems (HVAC); fire detection and protection features; security enhancements and other supporting work necessary to make a complete and useable facility. The type of set-aside, either small business or among the socioeconomic categories, if any, will depend upon the responses to this sources sought notice. The purpose of this notice is to gain knowledge of the experience and capabilities of both small and large business concerns in the construction industry, in performing similar projects in magnitude and complexity of this requirement. The Government is seeking to identify qualified sources either singularly or as part of an assembled team under North American Industry System (NAICS) code 236220 Commercial and Institutional Building Construction, which has a small business size standard of $45,000,000.00. In accordance with the Defense Federal Acquisition Regulation Supplement (DFARS), 236.204, the estimated construction price range for this project is between $25,000,000 and $100,000,000. The total contract performance period is anticipated to be 730 calendar days. In accordance with Federal Acquisition Regulation (FAR) 52.219-14, Limitations on Subcontracting, small business prime contractors will not pay more than 85 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 85 percent subcontract amount that cannot be exceeded. Prior Government contract work is not required for submitting a response under this source sought synopsis. Minimum capabilities required, include previous experience of projects similar in magnitude and complexity. Interested sources shall submit a capability statement demonstrating their ability to perform the work as described above. Responses should include the following information, which shall not exceed a total of six pages (not counting CPARS).. Offerors name, address,

Get matched to contracts like this daily

Free AI-powered contract matching for your business.