The response deadline has passed. Review the details for future reference or to track similar opportunities.
The Department of Veterans Affairs is procuring construction services for infrastructure upgrades at the University Drive VA campus in Pittsburgh, PA, to support the new Electronic Health Records Modernization (EHRM) system. The project involves modifications to multiple buildings, including the construction of new towers and renovations to existing spaces, with a total affected area of approximately 14,630 square feet.
The project involves construction work to upgrade the infrastructure at multiple buildings on the University Drive VA campus to support the EHRM system, including new towers and renovations.
scope of work shall generally consist of but is not limited to the following: construction work to facilitate all modifications at multiple existing buildings on the VAPHS University Drive VA campus to upgrade the infrastructure to support the new Electronic Health Records Modernization (EHRM) system. The upgrade to the infrastructure will be campus wide buildings impacted to include Buildings 1, 5, 8, 29, 30, 33, and site. The architectural total existing space square footage affected is approximately 3,030 SF with new tower addition square footage of 11,600 SF. Upgrades for these buildings will include the construction of new towers, existing rooms and telecommunication closets and include relocation, reconfiguration, expansion, and renovation involving new walls, doors and finishes, etc. throughout each space. Bid work will be based on “EHRM Infrastructure Upgrades” Drawings and Specifications prepared by AWEN Solutions, dated
13 June 2025. Construction work shall also comply with VA “Infrastructure Standard for Telecommunications Spaces (ISTS) V4.0, June 1, 2023. Bid work will include General Construction (and associated trades), Structural, Mechanical and HVAC, Plumbing and Fire Protection, Electric, and Information Technology, Civil. The VA Physical Security Design and Resiliency Manual (PDRSM)
requirements will need to be incorporated into the construction of the project. The areas of disturbance will be occupied by staff or patients during construction, so phasing shall be required. See
attachments for additional details. A DECISION TO SET-ASIDE THIS PROCUREMENT FOR ANY SPECIFIC SOCIO-ECONOMIC CATEGORY HAS NOT BEEN MADE AT THIS TIME Benjamin Niznik - Contract Specialist Alternative
Get matched to contracts like this daily
Free AI-powered contract matching for your business.