Closed
Save

Deer Island Ecosystem Restoration Phase 1 Breakwater Construction

Department of Defense (DoD) > U.S. Army > Engineer Division South AtlanticSol: W9127826RA046
SB
$44K – $1.1M per task order

This opportunity is closed

The response deadline has passed. Review the details for future reference or to track similar opportunities.

Quick Brief

The Department of Defense is procuring construction services for the restoration of Deer Island, specifically the initial phase of the breakwater structure known as Katrina Key. The project involves restoring approximately 12,000 feet of the rock breakwater to mitigate wave erosion, including the placement of armor layer stone or bioengineered reef. Contractors must comply with the updated FAR and DFARS regulations as part of their proposal.

Generated 27d ago

Scope & Requirements

The project entails the construction of a breakwater to protect Deer Island from wave erosion, restoring it to historical dimensions.

Contract Details

Contract Vehiclei
BPA
Estimated Value
$44K – $1.1M per task order
BPA ceiling: $35M
Similar contracts award $44K to $1.1M (median $204K, 8,310 awards)
NAICS Codes
Place of Performance
Deer Island, MS, US
Set-Asides
SB

Qualifications & Eligibility

Set-Aside Category
SDVOSB

Agency & Contact

Contracting Organization

Agency
DEPT OF DEFENSE
Sub-Agency
US Army Corps of Engineers
Office
Engineer Division South Atlantic

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

AM0001 posted2mo ago
May 28, 2026
Published29d ago
Jun 26, 2026
AM0002 posted29d ago
Jun 26, 2026
Became Solicitation28d ago
Jun 26, 2026
Tracked
Last Updated26d ago
Jun 28, 2026
Response Due17d ago
Jul 7, 2026

Description

Phase 1 Breakwater. This contract involves constructing the initial phase for the restoration of Deer Island, specifically restoring the extension of the rock breakwater structure known as Katrina Key, approximately 12,000 feet, to soften the effects of normal wave erosion. This restoration includes placement of armor layer stone or bioengineered reef as the breakwater and associated geocomposite placement to return Katrina Key to near historical 1850’s dimensions. Offerors are hereby advised that all references to the FAR and DFARS within this solicitation pertain to the new Revolutionary FAR Overhaul (https://www.acquisition.gov/far-overhaul/far-part-deviation-guide). While much of the verbiage has remained consistent with the previous version of the FAR and DFARS, there are notable differences. It is incumbent upon the contractor to be fully aware of these changes and ensure their proposal complies accordingly. 5/28/2026: AM0001 posted to PIEE 6/26/2026: AM0002 posted to PIEE Paul Adamo Alternative

Point of Contact Jillian Saffle

Get matched to contracts like this daily

Free AI-powered contract matching for your business.