The Department of Defense is procuring the replacement of the HVAC system at the West Fitness Center. The project involves design and construction services to install a new complete heating, ventilation, and air conditioning system, adhering to the specifications outlined in the statement of work. The budget for this project ranges from $1,000,000 to $1,400,000.
Get your fit score, win probability, and required capabilities.
The work involves the complete replacement of the HVAC system at the West Fitness Center, including design, provision, and installation of the new system.
Design and Construction service to completely replace the old heating and cooling system in the West side Fitness Center B585. Design, provide and install a new complete Heating, Ventilation, and Air Conditioning (HVAC) system. All services and materials to complete the work IAW the SOW. See Attachment 1 - SOW for more details. The budget parameters for this budget are between $1,000,000.00 and $1,400,000.00. SSgt Joshua J. Barber, USAF Alternative
Point of Contact Alexander Ramsower to this opportunity. Elec Consumption B585.pdf Gas Consumption B585.pdf Site Visit Q and A Response.pdf Attachment 2 - Evaluation Factors.pdf Solicitation - FA940126R0019.pdf Attachment 9 - Environmental Checklist-14Apr26.pdf Attachment 4 - B585 As-Builts.pdf Attachment 5 - Project Location and Floorplan.pdf Attachment 6-B585 Existing Utilities.pdf Attachment 7 - Kirtland AFB Comm Division Specs
15 May 2025.pdf Attachment 8 - Kirtland Air Force Base Low and Medium-Voltage Electrical Design and Equipmen.pdf Attachment 3 - Wage Determination - Building.pdf
Get matched to contracts like this daily
Free AI-powered contract matching for your business.