Closed
Save

Pittsburgh Engineering Warehouse Office Upgrades - Department of Defense

Department of Defense (DoD) > U.S. Army > Pittsburgh District
FFP
$25K – $400K per task order

This opportunity is closed

The response deadline has passed. Review the details for future reference or to track similar opportunities.

Quick Brief

The U.S. Army Corps of Engineers is procuring upgrades for the Pittsburgh Engineering Warehouse and Repair Station, which includes various construction tasks such as replacing ceiling tiles, lighting, HVAC diffusers, and flooring, as well as painting and minor repairs. The project is set aside 100% for small businesses and requires compliance with NIST SP 800-171 standards. The work is expected to be completed within 90 calendar days from the notice to proceed.

Generated 30d ago

Scope & Requirements

The project involves various construction upgrades at the Pittsburgh Engineering Warehouse and Repair Station, including replacing ceiling tiles, lighting fixtures, HVAC components, flooring, and performing painting and minor repairs.

Contract Details

Contract Typei
FFP
Awarded Amount
$25K – $400K per task order
IDIQ ceiling: $45M
Similar contracts award $25K$400K (median $99K, 73,582 awards)
Period of Performance
90 calendar days
NAICS Codes
Place of Performance
Pittsburgh, PA, USA

Qualifications & Eligibility

Set-Aside Category
Small Business
NAICS Size Standard
$45,000,000.00
Required Registrations
  • NIST SP 800-171 Assessment

Agency & Contact

Contracting Organization

Agency
DEPT OF DEFENSE
Sub-Agency
U.S. Army Corps of Engineers
Office
Pittsburgh District

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Amendment 0001 Issued3mo ago
Mar 16, 2026
Amendment 0002 Issued3mo ago
Mar 19, 2026
Amendment 0003 Issued2mo ago
Mar 30, 2026
Published2mo ago
Apr 3, 2026
Last Updated2mo ago
Apr 3, 2026
Second organized site visit conducted2mo ago
Apr 3, 2026
Became Award Notice2mo ago
Apr 3, 2026
Tracked
Response Due2mo ago
Apr 19, 2026

Description

the work is to furnish all equipment, labor of work, supervision, and materials necessary to complete the work as shown and as specified. The work includes the replacement of ceiling drop tiles; cleaning of the ceiling tile grid; replacement and standardization of lighting covers and bulbs; replacement of HVAC diffusers and return grating; removal of existing carpet and baseboards throughout the area; installation of carpet tiles and baseboards; replacement of interior doors; installation of locks on interior doors; removal and replacement of receptacles wall plates and switch plates; removal of wallpaper and wood paneling; minor repairs of damaged drywall; painting of walls, ceilings, and access hatches; and disassembly, movement, and reassembly of , furnishings, and cubicles as required to perform all tasks. These items shall include all other work required to complete the work as specified herein. The NAICS code is 236220 - Commercial and Institutional Building Construction with an associated small business size standard of $45,000,000.00 average annual revenue. Periods of Performance will be 90 calendar days from notice to proceed. The solicitation is set-aside 100% for Small Business. The contractor shall furnish all labor, equipment, devices, and materials and perform all work in accordance with the specifications. The contractor shall comply with all applicable federal, regional, state, and local laws and commercial standards. In accordance with DFARS 252.204-7020, all contractors are required to have a current (i.e., not more than three years old) NIST SP 800-171 DoD Assessment on record in the Supplier Performance Risk System (SPRS) to be considered for award. You are required to conduct, at a minimum, a Basic Assessment of your compliance with the 110 security controls outlined in NIST SP 800-171 and submit your summary level score to SPRS located in the Procurement Integrated Enterprise Environment (PIEE). We encourage your company to complete the NIST SP 800-171 Assessment via SPRS prior to the Request for Quote (RFQ) due date to be considered for an award. Any resultant award will be for one (1) Firm-Fixed Price (FFP) Purchase Order. All responsible quoters are encouraged to submit a quote. The Contractor shall perform all work as indicated in the specifications utilizing the best standards of performance and construction for the respective trades. The Contractor shall utilize personnel who are thoroughly trained and familiar with the indicated

requirements and the methods needed for proper performance of work. The Contractor shall coordinate construction to ensure uninterrupted progress and to provide an accurate fit between the works of all trades. The Contractor shall provide all equipment and materials necessary to complete the work as shown and as specified.NOTICE Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Business-With-Us/Partnering/ then clicking on ?View FFP Contract Changes Playbook Here?.

16 March 2026 - Amendment 0001 Issued19 March 2026 - Amendment 0002 Issued30 March 2026 - Amendment 0003 Issued

3 April 2026 - Second organized site visit conducted yesterday. Contracting Discussion and Site Visit Sign In sheet posted. Aaron Barr Alternative

Point of Contact Leanna

C. Lesefka Phone Number (412) 395-7549

Get matched to contracts like this daily

Free AI-powered contract matching for your business.