The response deadline has passed. Review the details for future reference or to track similar opportunities.
The Department of Veterans Affairs is procuring infrastructure upgrades for the EHRM project in Cheyenne, WY. Key requirements include electrical upgrades, HVAC improvements, communication infrastructure enhancements, and physical security upgrades across multiple buildings on campus. This project is set aside for Service-Disabled Veteran-Owned Small Businesses.
The project involves various infrastructure improvements including electrical panel upgrades, HVAC renovations, and communication infrastructure enhancements across multiple buildings.
The scope of the project includes the following infrastructure improvements: electrical (panel upgrades, power [normal/emergency]), bonding, UPS, building management system interfaces, new and upgraded HVAC, reconfiguration, expansion and renovation of existing space (demo, new construction, finishes). Expand space in MFA (demo, finishes, cable management, relocate cabinets), communication infrastructure (new data outlets, patch panels, upgrade to Cat 6A cable) in buildings as necessary, physical security upgrades, upgrades to fiber infrastructure backbone campus wide within buildings and between buildings, install diversified path to new data center for wide area network (WAN), hazardous material abatement. Project building locations include: Building 1 (Arrowhead, Buffalo, Cowboy, Douglas Fir), Building 4, Building 5, Building 6, Building 7, Building 8, Building 11, Building 12, Building 13, Building 23, Building 45, RRTP Building, & Site. Mica Tacderan Alternative
Point of Contact Jessica Hicks to this opportunity. Attachment 09 - 442-21-700 Cheyenne PreBid Sign In Sheets.pdf Attachment 08 - Site Visit Instructions.pdf Attachment 07 - Limitations on Subcontracting - Construction.docx Attachment 06 - DBA Wage Determination WY.pdf Attachment 05 -OEHRM Site Infrastructure and End User Device EUD
Requirements.pdf Attachment 04 -Infrastructure Standard for Telecommunication Spaces.pdf Attachment 03 - Spec 01 31 00.01 Project Management and Coordination.docx Attachment 02 - 442-21-700 EHRM Infrastructure Drawings.pdf Attachment 01 - 442-21-700 EHRM Infrastructure Specifications.pdf S02 - 36C77626R0007.pdf
Get matched to contracts like this daily
Free AI-powered contract matching for your business.