Awarded
Save

Replace Windows in Buildings 4, 8, and 9

Veterans Affairs (VA)
SDVOSB

This contract has been awarded

This opportunity is closed. Review the award details to understand pricing and competitors for future similar contracts.

Contract Details

Awarded Amount
Similar contracts award $11K to $46K (median $21K, 414 awards)
NAICS Codes
Set-Asides
SDVOSB

Agency & Contact

Contracting Organization

Agency
VETERANS AFFAIRS, DEPARTMENT OF

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Published9d ago
Jul 15, 2026
Last Updated9d ago
Jul 15, 2026
Became Award Notice8d ago
Jul 15, 2026
Tracked
Response Duein 21d
Aug 14, 2026

Description

# 656-12-222 Replace Windows Building 4 Building 8 and Building 9 The Contractor shall furnish all labor, materials, tools and equipment required to repair, remove, replace and completely refurbish all windows in Buildings 4,8 and 9. The contractor shall remove the existing internal and external window trim and wall finishes in order to successfully gain access to and cut out the existing wood windows. Incorporated into the demolition of the windows will be the safe removal of both lead and asbestos containing material as guided by the local and national rules and regulations of lead and asbestos remediation. Additionally, the contractor will be responsible for the complete and satisfactory installation of the new window frames and sashes, screens and storm windows. The window installation shall include the patching and painting of walls, ceiling installation and restoration, trim and millwork installation, and repair of all damaged items in place. This work will be completed in an occupied building; all construction activities shall be completed behind proper construction barriers as described in the specifications. The contractor shall return the worksite to the Veterans Affairs Health Care System after the work is completed, and all of the required work is satisfactorily completed and signed off by the assigned

Contracting Officer's Representative. Refer to the contract specifications and drawings for details All work completed in accordance with the specifications and contract drawings.

Period of Performance is 445 Calendar Days Dwayne Brauch to this opportunity. 36C26326B0035_7.15.26.pdf Attach A-Final SOW B4_8_9 Windows.pdf Attach B -

Questions Request Form - 1 page.pdf Attach C-Wage Determination MN202600099 5 18 2026 Stearns county.pdf Attach D VAAR 852.219 75 Limitations on Subcontracting Cert of Compliance_JAN 2023.pdf Attach E-Bldg 4-8-9 wdw specs use.pdf

Get matched to contracts like this daily

Free AI-powered contract matching for your business.