Closed
Save

Transition Power Supply Installation Indefinite Delivery Indefinite Quantity Contract

Dept. of Commerce > National Oceanic & Atmospheric AdministrationSol: 1305M226Q0038
SBFFP
$160 – $10K per task order

This opportunity is closed

The response deadline has passed. Review the details for future reference or to track similar opportunities.

Quick Brief

The Department of Commerce is procuring a 5-year Indefinite Delivery Indefinite Quantity (IDIQ) contract for the installation and supply of Eaton 93PM UPS systems and associated equipment for the Radar Operations Center. Key requirements include the installation of power supply units and maintenance bypass modules at specified sites, along with the provision of technical compliance documentation and an installation plan. Vendors must ensure all installation travel costs are included in their pricing and provide necessary documentation to avoid non-responsiveness.

Generated 22d ago

Scope & Requirements

The work involves the installation and supply of Eaton 93PM UPS systems and maintenance bypass modules for the Radar Operations Center, including technical compliance and installation planning.

Contract Details

Contract Typei
FFP
Contract Vehiclei
IDIQ
Estimated Value
$160 – $10K per task order
IDIQ ceiling: $1.2M
Similar contracts award $160 to $10K (median $1K, 30,331 awards)
Period of Performance
5 years
NAICS Codes
Set-Asides
SB

Qualifications & Eligibility

Set-Aside Category
NEOUS
Past Performance
All required documents must be submitted on time to avoid non-responsiveness.

Agency & Contact

Contracting Organization

Agency
COMMERCE, DEPARTMENT OF
Sub-Agency
National Oceanic and Atmospheric Administration

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Published24d ago
Jul 1, 2026
Became Solicitation23d ago
Jul 1, 2026
Tracked
Last Updated21d ago
Jul 3, 2026
Response Due17d ago
Jul 7, 2026

Description

The Government is seeking a 5-year IDIQ for the following: Eaton 93PM UPS and maintenance bypass module (MBM) and Battery cabinet with batteries installed at sites specified in Table 3 of the SON (any associated installation travel costs must be built in to the per unit

pricing). Eaton 93PM UPS and MBM sidecar and Battery cabinet with batteries installed at the sites prescribed in Table 3 of the SON (any associated installation travel costs must be built in to the per unit

pricing). and; Eaton 93PM UPS and sidecar w/MBM and Battery cabinet WITHOUT batteries; shipped to the National Logistics Support Center. (NO INSTALLATION) Vendors are responsible for providing all information and documentation listed in Section L- Instructions, Conditions, and Notices to Bidders of attachment Sol_1305M226Q0038, including Volume I: Technical Compliance, Volume II: Installation Plan, Volume Ill: Past Performance, and Volume 4: Price. Evaluation information for those volumnes are provided in Section M - Evaluation Factors for Award. Failure to provide ALL required documents on time will result in submissions being deemed non responsive. Amendment 1: posted 7/1/26; includes

questions submited during the inquiries period with their respective answers. Additionally, an Excel document is attached that is referenced in the Q&A document. Taylor Wisneski Alternative

Point of Contact Kevin J. Buum to this opportunity. Amendment 1.docx.pdf Site IP addresses for TPS-UPS (1).xlsx Sol_1305M226Q0038 (1).pdf JOFOC for combined synopsis (1)_Redacted (3).pdf SON Final.docx (5).pdf

Pricing_Schedule (4).xlsx Past Performance Information Form (5).pdf Past Performance Questionnaire (5).pdf TPS Effectivity_All Sites (with SON) (2).pdf

Get matched to contracts like this daily

Free AI-powered contract matching for your business.