The response deadline has passed. Review the details for future reference or to track similar opportunities.
The U.S. Army Corps of Engineers is seeking comments on the use of a Project Labor Agreement (PLA) for the conversion of two existing barrack buildings into operational facilities at Joint Base Lewis McChord, Washington. Key requirements include hazardous material abatement, partial demolition, and new construction work.
General work will convert two existing barrack buildings into operational facilities, including hazardous material abatement, partial demolition, and new construction work.
This listing does not include downloadable attachments. The solicitation details may be in the description below.
Verify on SAM.govSubject: Joint Base Lewis McChord, WA Multi Domain Task Force (MDTF) Buildings 3223-3224 NAICS Code: 236220 Commercial and Institutional Building Construction, size standard $45M : Y1AZ Construction of Other Administrative Facilities and Service Buildings Posted: 03/23/2026 Due: 04/06/2026 THIS IS A PROJECT LABOR AGREEMENT (PLA) SURVEY ONLY. THIS IS NOT A REQUEST FOR PROPOSAL, REQUEST FOR QUOTE, OR INVITATION FOR BID. THERE WILL NOT BE A SOLICITATION, SPECIFICATIONS OR DRAWINGS AVAILABLE AT THIS TIME. This is a SPECIAL NOTICE. No proposals are being requested or accepted with this notice. The Corps of Engineers Seattle District is soliciting comments from the construction community addressing the required use of PLA for large scale construction projects as defined by FAR 22.502 (Total estimated costs of the construction contract to the Federal Government is $35 million or more) within Tacoma, Washington. DESCRIPTION OF WORK: General work will convert two (2) existing barrack buildings into operational facilities for 3 tier levels of command. These buildings in general are referred as “the Hammer Heads”. The Hammer Handles have three (3) floors with a crawl space at grade elevation. The Hammer Heads are single floor. The Basement area with a main utility mechanical & electrical room extends partially under both the Hammer Head and the Hammer Handle. The definitive removal / demolition work items for each building will require: a) Hazardous material / debris abatement and removal mostly within the crawl space b) Partial at ~ 75% removal / demolition of exterior building envelope, interior walls, etc, c) Removal at ~ 90% removal of building mechanical – electrical systems d) Removal of the existing roof EPDM system (but not the roof framing structure) The definitive repair / new work items for each building will require: e) New exterior envelope f) New building mechanical – electrical systems g) New roof TPO system Other considerations for site work coordination h) New utility connections (mostly by other entities) i) Shared construction boundaries with adjacent current and future projects MAGNITUDE: In accordance with DFARS 236.204, the magnitude of the estimated cost of construction (ECC) range for this project is between $25,000,000 and $100,000,000. FACTORS TO BE CONSIDERED: Some of the factors that may be considered regarding PLA use for this project are: FAR 22.504(d), Exceptions to project labor agreement
requirements: (i): Requiring a project labor agreement on the project would not advance the Federal Government's interests in achieving economy and efficiency in Federal procurement. The exception shall be based on one or more of the following factors:
questions:
1) Do you have knowledge that a PLA has been used in the local area on projects of this kind? If so, please provide supporting documentation.
2) Are you aware of skilled labor shortages in the area for those crafts that will be needed to complete the referenced project? If so, please elaborate and provide supporting documentation where possible.
Get matched to contracts like this daily
Free AI-powered contract matching for your business.