The Department of Defense is procuring repair services for the Array Brazing Assembly, which involves restoring the assembly to a serviceable condition according to OEM specifications and approved methods. The contractor must possess the necessary expertise, labor, tools, and equipment to perform just-in-time repairs and maintain detailed test and repair records. The proposal due date has been extended to June 22, 2026.
Get your fit score, win probability, and required capabilities.
The work involves the repair and restoration of the Array Brazing Assembly to a serviceable condition, requiring adherence to OEM specifications and approved methods.
This requirement is for the repair and restoration of the Array Brazing Assembly to a serviceable condition. The qualified repair source/contractor will repair the item per OEM specification, approved technical orders and methods approved through the cognizant engineer at the time of qualification or during continuing qualification. Array Brazing Assembly item repairs are categorized as just-in-time repairs, not scheduled repairs. The contractor shall provide and maintain all the capabilities to test and repair the mentioned items to serviceable ?A? condition such as, but not limited to, all the expertise, labor, tools, equipment, and parts in order to deliver the serviceable items within the time period specified on the contract. The contractor shall maintain test and repair records that include cost accounting records of all items serviced under the contract.NSN: 1270-01-077-8078WF. Amendment 0002 incorporate clause 52.222-90. Amendment 0003 extends the proposal due out date to
22 June 2026. Sean Neilson Alternative
Get matched to contracts like this daily
Free AI-powered contract matching for your business.