The response deadline has passed. Review the details for future reference or to track similar opportunities.
The Department of Defense is procuring the GAGE FORCE, which includes the manufacture of a Vehicle Propulsion Unit and associated parts. Key requirements include compliance with military standards for marking and inspection, with a delivery timeline of 90 days. This procurement is set aside for small businesses.
The contract involves the manufacturing of the GAGE FORCE, including a Vehicle Propulsion Unit and its parts, adhering to specified military standards.
|4|N97113|FA|771-229-0460|[email protected]| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| GENERAL INFORMATION-FOB-DESTINATION|1|B| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Invoice and Receiving Report (Combo)|Inspection / Acceptance Point: Source|TBD|N00104|TBD|TBD|SEE SCHEDULE|TBD|N/A|N/A|TBD|N/A|N/A|N/A|N/A|[email protected]| NOTE FOR CONTRACTOR/ADMINISTRATIVE
CONTRACTING OFFICER|3|||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (OCT 2020)(DEVIATION 2020-O0008)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2025)|13|||||||||||||| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2025)(DEVIATION 2025-O0003 AND2025-O0004))|13|336415|1250|||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| TO VIEW THE DRAWINGS: Go to www.sam.gov Click: Contract Opportunities and enter the solicitation number. This gives access to the Electronic Solicitation. Drawings can be viewed or downloaded. GOVERNMENT SOURCE INSPECTION per FAR 52.246-2 IS REQUIRED. DELIVERY 90 DAYS. All contractual documents (i.e. contracts, purchase orders, task orders,delivery orders and modifications) related to the instant procurement areconsidered to be "issued" by the Government when copies are either depositedin the mail, transmitted by facsimile, or sent by other electronic commercemethods, such as email. The Government's acceptance of the contractor'sproposal constitutes bilateral agreement to "issue" contractual documents asdetailed herein. \ 1. SCOPE 1.1 This contract/purchase order contains the
requirements for manufacture of the GAGE FORCE . 2. APPLICABLE DOCUMENTS 2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.1.1 Documents, drawings, and publications supplied are listed under "Drawing Number". These items should be retained until an award is made. 2.1.2 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 2.1.3 The "Document Changes" section provides supersessions/changes to referenced documents. 2.2 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the drawings shall take precedence. Nothing in this contract/purchase order, however, shall supersede applicable laws and regulations unless a specific exemption has been obtained. DRAWING DATA=AN2J1 |10001| -|1N |D| | | | DRAWING DATA=2850073 |10001| F| |D| | | | DRAWING DATA=2850073 |10001| G|PL |D| | | | DOCUMENT REF DATA=MIL-DTL-31000 | | |C |040709|A| | | DOCUMENT CHANGE DATA=DOD-D-1000 |MIL-DTL-31000 3.
REQUIREMENTS 3.1 Manufacturing and Design - The GAGE FORCE furnished under this contract/purchase order shall meet the material and physical
requirements as specified ;P/N: 2850073 cage 10001; . 3.2 Marking - Unless marking
requirements are specified by a document or drawing cited in this solicitation all items delivered under this contract/purchase order shall be marked and identified in accordance with the applicable Military Standards and Specifications as follows: Mechanical Parts, Assemblies and Equipments - MIL-STD-130 Electrical and Electronic Parts - MIL-STD-1285, Method 1. Electrical and Electronic Parts and Assemblies not covered by MIL-STD-1285-use MIL-STD-130. Electronic Equipment - MIL-STD-454 Requirement Number 67. Electrical Equipment - MIL-P-15024/5 (SHIPS) 3.3 Configuration Control - MIL-STD-973 entitled "Configuration Management", Paragraph 5.4.8, Configuration Control (Short Form Procedure), is hereby incorporated. The Contractor shall submit all Engineering Change Proposals in accordance with MIL-STD-973, Paragraph 5.4.8.2 and Appendix
Get matched to contracts like this daily
Free AI-powered contract matching for your business.