Closed
Save

Power Supply and Maintenance Bypass Module Installation

Dept. of Commerce > National Oceanic & Atmospheric AdministrationSol: 1305M226Q0038
SBTBD
$160 – $10K per task order

This opportunity is closed

The response deadline has passed. Review the details for future reference or to track similar opportunities.

Quick Brief

The Department of Commerce is procuring a 5-year Indefinite Delivery Indefinite Quantity (IDIQ) contract for the installation of Eaton 93PM UPS systems and associated equipment at specified sites. Key requirements include providing all necessary documentation for technical compliance, installation plans, and past performance, with a focus on ensuring all installation travel costs are included in the pricing.

Generated 18d ago

Scope & Requirements

The work involves the installation of Eaton 93PM UPS systems and related equipment at designated sites, as well as shipping equipment to the National Logistics Support Center without installation.

Contract Details

Contract Type
TBD
Contract Vehiclei
IDIQ
Estimated Value
$160 – $10K per task order
IDIQ ceiling: $1.2M
Similar contracts award $160 to $10K (median $1K, 30,331 awards)
Period of Performance
5 years
NAICS Codes
Set-Asides
SB

Qualifications & Eligibility

Set-Aside Category
8(a)
Past Performance
ALL required documents on time will result in submissions being deemed non responsive.

Agency & Contact

Contracting Organization

Agency
COMMERCE, DEPARTMENT OF
Sub-Agency
National Oceanic and Atmospheric Administration

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Amendment 1 Posted24d ago
Jul 1, 2026
Published19d ago
Jul 6, 2026
Amendment 2 Posted19d ago
Jul 6, 2026
Became Solicitation18d ago
Jul 6, 2026
Tracked
Last Updated18d ago
Jul 7, 2026
Response Due Date11d ago
Jul 14, 202613:00
Extended by Amendment 2
Response Due10d ago
Jul 14, 2026

Description

The Government is seeking a 5-year IDIQ for the following: Eaton 93PM UPS and maintenance bypass module (MBM) and Battery cabinet with batteries installed at sites specified in Table 3 of the SON (any associated installation travel costs must be built in to the per unit

pricing). Eaton 93PM UPS and MBM sidecar and Battery cabinet with batteries installed at the sites prescribed in Table 3 of the SON (any associated installation travel costs must be built in to the per unit

pricing). and; Eaton 93PM UPS and sidecar w/MBM and Battery cabinet WITHOUT batteries; shipped to the National Logistics Support Center. (NO INSTALLATION) Vendors are responsible for providing all information and documentation listed in Section L- Instructions, Conditions, and Notices to Bidders of attachment Sol_1305M226Q0038, including Volume I: Technical Compliance, Volume II: Installation Plan, Volume Ill: Past Performance, and Volume 4: Price. Evaluation information for those volumnes are provided in Section M - Evaluation Factors for Award. Failure to provide ALL required documents on time will result in submissions being deemed non responsive. Amendment 1: posted 7/1/26; includes

questions submited during the inquiries period with their respective answers. Additionally, an Excel document is attached that is referenced in the Q&A document. Amendment 2: posted 7/6/26; no additional documents are included. This amendment only extends the response due date one week to 7/14/26 1:00pm ET. Taylor Wisneski Alternative

Point of Contact Kevin J. Buum to this opportunity. Amendment 1.docx.pdf Site IP addresses for TPS-UPS (1).xlsx Sol_1305M226Q0038 (1).pdf JOFOC for combined synopsis (1)_Redacted (3).pdf SON Final.docx (5).pdf

Pricing_Schedule (4).xlsx Past Performance Information Form (5).pdf Past Performance Questionnaire (5).pdf TPS Effectivity_All Sites (with SON) (2).pdf

Get matched to contracts like this daily

Free AI-powered contract matching for your business.