Roof and HVAC Repair for Building 300 at Portsmouth Naval Shipyard

Department of Defense (DoD) > NAVFAC ATLANTIC CMDNAVFAC MID-ATLANTIC
est. $5.0M – $45M

This opportunity is closed

The response deadline has passed. Review the details for future reference or to track similar opportunities.

Quick Brief

The project involves the repair and replacement of the roof and HVAC systems at the B300 Waterfront Machine Shop located at Portsmouth Naval Shipyard. Key requirements include the removal of existing roofing and HVAC equipment, asbestos abatement, and installation of new systems to improve air quality and fire safety.

Generated 71d ago

Scope & Requirements

The work includes the removal and replacement of the roof and HVAC systems, asbestos abatement, and site improvements for utility construction.

Contract Details

Estimated Value
est. $5.0M – $45M
Similar contracts award $25K$400K (median $99K, 73,582 awards)Above typical range
NAICS Codes
Place of Performance
Kittery, Maine, USA

Agency & Contact

Contracting Organization

Agency
DEPT OF DEFENSE
Sub-Agency
DEPT OF DEFENSE
Office
NAVFAC ATLANTIC CMDNAVFAC MID-ATLANTIC

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Published3mo ago
Mar 10, 2026
Last Updated3mo ago
Mar 10, 2026
Became Special Notice3mo ago
Mar 10, 2026
Tracked
Response Due2mo ago
Mar 25, 2026

Description

a manufacturing and machining facility. The existing roof system has surpassed its design/service life and has deteriorated to the point where there are significant leaks to the interior. The building interior is exposed to water infiltration due to these roof failures. The HVAC systems were installed during the original construction of the building between 1979 and 1984. No substantial changes have been made to the HVAC system since. The existing HVAC systems have depositions of RCRA 8 metals within them.The project will remove existing roofing which has exceeded its useful service life and provide for replacement with a new fully adhered 0.080 thermoplastic polyolefin (TPO) roof membrane assembly. The project also provides the removal of all air handling equipment and removal or abandonment-in-place of associated ductwork that conditions the industrial work areas. The project includes measures to contain RCRA 8 dust and abate asbestos containing materials that are known to be present within ductwork. The project provides replacement of the existing steam to hot water plant, the addition of unit heaters to provide heat to the industrial work areas and dedicated outdoor air systems to provide fresh air to the space accompanied by destratification fans for occupant comfort. The project provides removal and replacement of the existing fire alarm and mass notification system and fire sprinkler system serving the industrial work areas. The project includes removal and replacement of the existing 2500 kVA main service transformer feeding Switchgear 4, replacement of the 15 kV service switch, and replacement of the 480V main and feeder switchgear.Site improvements include utility construction and restoration of disturbed areas resulting from demolition activities. Utilities include electrical and fire safety systems. Mary Pool Contracting (No Street Address

2) NORFOLK, VA 23511-0395 USA