The Department of Veterans Affairs is contracting for the replacement of the boiler plant at a facility, specifically targeting service-disabled veteran-owned small businesses. Key requirements include monitoring SAM.gov for updates and amendments to the solicitation, with a focus on construction related to power and communication line structures.
Get your fit score, win probability, and required capabilities.
Solicitation and documents uploaded. Solicitatoin posted on April 21, 2026. Amendment 0001 posted on April 27, 2026. Amendment 0002 posted on May 8, 2026. Amendment 0003 posted on May 21, 2026. RFO Language – Contractor Responsibility to Monitor SAM.gov Monitoring of Solicitation and Amendments Offerors are hereby advised that it is solely the responsibility of the offeror/contractor to monitor SAM.gov (Contract Opportunities) for the posting of this solicitation, any amendments,
attachments, clarifications,
questions and answers, or other updates issued by the Government. The Government is not responsible for ensuring that vendors receive or access solicitation amendments or updates. Failure of an offeror to review SAM.gov and incorporate posted amendments into its proposal shall not be grounds for relief, reconsideration, or protest, and may result in the bid being determined non‑responsive or ineligible for award. Offerors shall ensure they are regularly checking the following location for updates. Horacio Fernandez to this opportunity. 36C25726B0006 0001.pdf 36C25726B0006 Boiler Plant Site Visit 2.pdf 36C25726B0006 0003.pdf 36C25726B0006 0002.pdf Site Visit Instructions Big Spring TX.pdf 36C25726B0006 Solicitation Posting SAM.gov.pdf Attachment 1 519-20-200 VABS AE Replace Boiler 100_Percent_Design Analysis.pdf Attachment 3 519-20-200 VABS AE Replace Boiler 100_Percent_Drawings_Pages62_124.pdf Attachment 2 519-20-200 VABS AE Replace Boiler 100_Percent_Drawings_Pages1_62.pdf Attachment 4 519-20-200 VABS AE Replace Boiler 100_Percent_Specifications.pdf Attachment 5 ICRA Replace Boilers.pdf 36C25726B0006 Solicitation.pdf Attachment 6 PCRA Replace Boilers.pdf Attachment 7 Instructions for Calculation of Self-Performed Work.pdf
Get matched to contracts like this daily
Free AI-powered contract matching for your business.