The Department of Veterans Affairs is contracting for infrastructure upgrades at the Asheville medical center. The project involves comprehensive construction work including electrical upgrades, HVAC renovations, communication infrastructure improvements, and physical security enhancements across multiple buildings. Contractors must adhere to VA regulations and complete the work in accordance with provided drawings and specifications.
Get your fit score, win probability, and required capabilities.
The work includes construction of infrastructure upgrades, electrical panel upgrades, HVAC renovations, and communication infrastructure enhancements at the Asheville medical center.
Amendment 0005 has been posted. This amendment extends the date for offers due to 8/7 at 3PM EDT. It also adds FAR clause 52.212-4 and removes FAR clauses 52.249-2 and FAR 52.249-10. Amendment 0004 has been posted. This amendment extends the date for offers due to 7/27 at 3PM EDT. Amendment 0003 has been posted. This amendment extends the date for offers due to 7/13 at 3PM EDT. Amendment 0002 has been posted. This amendment extends the date for offers due to 7/1 at 3PM EDT. Amendment 0001 has been posted along with its
attachments. This amendment adds the site visit sign-in sheet and agenda from the site visit on 6/9. The contractor shall provide all tools, equipment, materials, labor, supervision, and management to complete the construction of infrastructure upgrades to the campus. Construction practices shall comply with all VA solicitation drawings and specifications, VA regulations, procedures, and conditions for work at the medical center and any applicable codes as per
requirements of all governing agencies. Work includes, but is not limited to, electrical (electrical panel upgrade, power (normal, emergency)), Bonding, UPS, Building Management System interfaces, asses for new and upgrades to existing HVAC, reconfiguration, expansion and renovation of existing space (demo, new construction, finishes, cable), Renovation Datacenter work (HVAC, UPS, Power distribution, cable management, expansion of space, fire suppression, finishes), communication infrastructure (new Data outlets, patch panels, upgrade to Cat 6A cable) in buildings as necessary, physical security upgrades, assess and upgrade fiber infrastructure backbone campus wide within buildings and between buildings, provide diversified path for wide area network connection, hazardous material abatement. Project buildings include: Buildings 47, 62, 14, 15, 9, 7, 6, 5, 4, 3, 2, 73, 70, 11, 12 and site. Contractor shall complete the intent of project 637-22-700 in strict accordance with the drawings and specifications. All work not specifically identified by the drawings and/or specifications but necessary for a complete system shall be included as if specifically identified in the Contract Documents. Andrew Mathews Alternative
Point of Contact Scott Elias to this opportunity. Amendment 0005.pdf Amendment 0004.pdf Amendment 0003.pdf Amendment 0002.pdf Amendment 0001 - Site Visit Sign In.pdf Amendment 0001 - Site Visit Agenda.pdf Amendment 0001.pdf Attachment 12 - Wage Determination.pdf Attachment 13 - Site Visit Details.pdf Attachment 10 -
Key Personnel.docx Attachment 9 - Key Subcontractor Information.docx Attachment 11 - Division
Pricing Template.xlsx Attachment 8 - Limitations on Subcontracting - Construction.docx Attachment 7 - Drawings Volume VI.pdf Attachment 6 - Drawings Volume V.pdf Attachment 5 - Drawings Volume IV.pdf Attachment 4 - Drawings Volume III.pdf Attachment 3 - Drawings Volume II.pdf Attachment 2 - Drawings Volume I.pdf Attachment 1 - Specifications.pdf
Get matched to contracts like this daily
Free AI-powered contract matching for your business.