This opportunity is closed. Review the award details to understand pricing and competitors for future similar contracts.
The Department of Defense is procuring the construction of a 30 ft. x 60 ft. metal equipment storage structure at Conchas Dam, New Mexico. The contractor will provide all necessary labor, materials, and supervision, ensuring compliance with engineering standards and soil compaction requirements. This project is awarded as an 8(a) Sole Source set-aside, requiring the contractor to submit certified engineering documentation and testing reports.
The contractor will construct a metal equipment storage structure, including site preparation, foundation design, and compliance with engineering standards.
This listing does not include downloadable attachments. The solicitation details may be in the description below.
Verify on SAM.govThis action was awarded as an 8(a) Sole Source Set-Aside under the authority of section 8(a) of the Small Business Act. Contractor shall furnish all labor, materials, equipment, and supervision required for the purchase and construction of a 30 ft. x 60 ft. metal equipment structure located at Conchas Dam, New Mexico. The Pre-engineered Metal Building package shall have Professional Engineer stamped drawings certifying the building fit, form, and function. Subgrade and Compaction: The Contractor shall scarify, compact, and grade the subgrade in preparation for the concrete footer. Soil must be compacted to a minimum of 95% of its maximum dry density as determined by standard testing methods. As a condition precedent to the placement of any concrete, the Contractor shall conduct soil compaction testing through an independent, qualified testing laboratory. A certified report detailing all test locations, methods, and results shall be formally submitted to the Government Representative.Perimeter Footings with Piers: The Contractor shall be responsible for the complete design and construction of a reinforced concrete footer system adequate to support the steel equipment structure.Foundation and Anchoring: Structural columns shall be anchored to pier foundations on the concrete footer. The foundation design must meet the building manufacturer’s recommendations and be stamped by a Professional Engineer Glenda
D. Kohlieber to this opportunity.
Get matched to contracts like this daily
Free AI-powered contract matching for your business.