Midway Atoll NWR Sewer System Repairs

Dept. of the Interior > U.S. Fish & Wildlife Service > GAOASol: 140FGA26R0020
8(a)HUBZoneSDBSDVOSBWOSBFFP
$44K – $1.1M per task order

This opportunity is closed

The response deadline has passed. Review the details for future reference or to track similar opportunities.

Quick Brief

The U.S. Fish and Wildlife Service is conducting market research to develop an acquisition strategy for a design-build contract to repair and replace critical sanitary sewer system components and harbor infrastructure at Midway Atoll National Wildlife Refuge, including piping, lift stations, manholes, the tug pier, seawall, and finger piers, with the project requiring compliance with NEPA and a total value exceeding $10 million.

Generated 30d ago

Scope & Requirements

Design-build services to replace major components of the sanitary sewer system and repair harbor infrastructure including the tug pier, seawall, and finger piers at Midway Atoll National Wildlife Refuge, with associated planning, permitting, and construction activities.

Deliverables

  • 100% design documents for sewer system replacement
  • NEPA compliance documentation
  • Construction of repaired sewer system
  • Repair or replacement of tug pier, harbor seawall, and finger piers
  • Repair of south seawall

Contract Details

Contract Typei
FFP
Contract Value
$44K – $1.1M per task order
IDIQ ceiling: $45M, 1 awardee
Similar contracts award $44K$1.1M (median $204K, 8,719 awards)
The magnitude of the construction project is more than $10,000,000.
Period of Performance
730 days for sewer system replacement and NEPA compliance; 1,825 days for other tasks
Expected Awards
1
NAICS Codes
Place of Performance
Midway Atoll, HI, US
Set-Asides
8(a), HUBZone, SDB, SDVOSB, WOSB

Qualifications & Eligibility

NAICS Size Standard
$45.0 million

Agency & Contact

Contracting Organization

Agency
INTERIOR, DEPARTMENT OF THE
Sub-Agency
U.S. Fish and Wildlife Service
Office
GAOA

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Published1mo ago
May 4, 2026
Became Solicitation1mo ago
May 5, 2026
Tracked
Last Updated1mo ago
May 5, 2026
Response deadline17d ago
May 18, 202615:00
PDT
Response Due16d ago
May 18, 2026

Description

a Sources Sought Notice for the purpose of conducting market research and obtaining industry information ONLY. Proposals are NOT being requested, nor accepted at this time. THIS IS NOT A REQUEST FOR PROPOSALS, QUOTATIONS OR BIDS, NOR A SYNOPSIS OF A PROPOSED CONTRACT ACTION UNDER FAR SUBPART 5.2 and no contract shall be awarded from this notice. No reimbursement will be made for any costs associated with providing information in response to this Sources Sought or any follow-up information requests. No Solicitation is currently available. The purpose of this notice is to obtain information from businesses that are interested and capable of providing the types of services noted below. The United States Fish and Wildlife Service (USFWS) will use information obtained through this notice as well as other market research to develop an acquisition strategy.

A. SUMMARY OF REQUIREMENT (REFER TO

ATTACHMENTS FOR FURTHER INFORMATION): The USFWS anticipates soliciting and awarding one Firm Fixed Price (FFP) contract for design build services to complete needed improvements to the sanitary sewer system and to harbor infrastructure at Midway Atoll National Wildlife Refuge (NWR). Much of the island¿s infrastructure was built in the World War II era and is well beyond its useful life. The US Fish and Wildlife Service (Service) operates and maintains the NWR as well as Henderson Airfield with Service staff and contractor staff residing on the island year-round. To maintain operations and keep staff on-island, significant repairs to the sewer system and inner harbor are needed. The scope of this effort includes replacement of major components of the existing sewer system including piping, lift stations, manholes, etc.as well as other associated work. It also includes planning, design, permitting, and construction activities to repair or replace infrastructure within the inner harbor and the south seawall. The

objectives of this project are to repair infrastructure on Midway Atoll NWR that are critical to continued operations. This project has three main

objectives, listed below in order of priority:1. Replacement of sewer system per 100% design documents. 2. Design Build: Replace or repair critical harbor infrastructure to allow for continued harbor operations. a. Tug Pier (Base)b. Harbor Seawall (Option)c. Finger Piers (small vessel docks; Option)3. Repair South Seawall (Option) The

period of performance for Task 1, Replacement of Sewer System is 730 days from the Notice to Proceed (NTP). The