Closed
Save

Bolt Replacement Survey and Plan for Hospital Buildings

Veterans Affairs (VA)
FFP
est. $72K – $867K

This opportunity is closed

The response deadline has passed. Review the details for future reference or to track similar opportunities.

Quick Brief

The Department of Veterans Affairs is contracting for a survey and replacement plan for ASTM A307 bolts at the Oklahoma City Veterans Affairs Health Care System. The contractor will identify the locations of existing ASTM 307 bolts, develop a replacement plan to replace them with ASTM A193 bolts, and ensure compliance with all relevant safety and regulatory standards. The project must be completed within 30 days after the Notice to Proceed.

Generated 30d ago

Scope & Requirements

The contractor will survey and document the locations of ASTM 307 bolts in high and medium pressure steam and hot water piping systems, and develop a replacement plan to replace them with ASTM A193 bolts.

Contract Details

Contract Typei
FFP
Estimated Value
est. $72K – $867K
Similar contracts award $71K$837K (median $251K, 105,964 awards)Within typical range
Period of Performance
30 days after Notice to Proceed
NAICS Codes
Place of Performance
Oklahoma City, Oklahoma, USA

Agency & Contact

Contracting Organization

Agency
VETERANS AFFAIRS, DEPARTMENT OF

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Published3mo ago
Mar 19, 2026
Last Updated3mo ago
Mar 19, 2026
Response Due2mo ago
Apr 3, 2026

Description

Z2DZ--Bolt Replacement Survey and Replacement Plan 635 - ASTM307 Z2DZ--Bolt Replacement Survey and Replacement Plan 635 - ASTM307 VETERANS AFFAIRS, DEPARTMENT OF VETERANS AFFAIRS, DEPARTMENT OF (36C259) N OF OTHER HOSPITAL BUILDINGS Oklahoma City Veterans Affairs Health Care System Statement of Work (SOW) ASTM307 Bolt Replacement Survey GENERAL: This project is to survey and identify locations of ASTM 307 bolts and develop a replacement plan to replace the bolts with the required ASTM A193 at the OKC VA HCS at Oklahoma City, Oklahoma.

The contractor is fully responsible for verifying and validating all information contained within this statement of work.

Contractor must fully evaluate the condition of the existing structures and verify the current condition of the project site.

All measurements/quantities provided in this document are approximate and are to be used for reference only.

The contractor will be responsible for taking on-site measurements and verifying all quantities and distances.

All materials/fasteners/etc. must be new and provided by the contractor unless otherwise specified.

Get matched to contracts like this daily

Free AI-powered contract matching for your business.