The Department of Defense is procuring the purchase and installation of four shade structures for the Experimental Operations Unit at Creech AFB. Key requirements include the design and construction of the shade structures, relocation of existing structures, and specific features such as LED lighting and solar paneling. The project aims to enhance the functionality of the airfield's parking apron for CCA aircraft.
Get your fit score, win probability, and required capabilities.
The contractor will design, provide, and construct four new shade structures on the airfield's parking apron, including the relocation of existing structures and demolition of one sunshade.
The Experimental Operations Unit (EOU) at Creech AFB requires the purchase and installation of four shade structures for the CCA aircraft based on site. Also, the relocation of the four existing structures and demolition of the 5th sunshade. Four current sunshades will be turned perpendicular and align with the new sunshades. The contractor shall design, provide, and construct the following shade structures on the airfield's parking apron:
1) Four CCA shade structures that include four aircraft parking bays each. The new shade structures will be located on south ramp west of the current shade structures.
2) Column concrete footings, per footing, as needed.
3) The new shade structures will adhere to the following
requirements: The shade structure will require LED lights and their conduit, CU wiring, service power outlets, a service panel and its Una-strut support assembly, and a solar battery powered obstruction light.
4) PVA (Photovoltaic Array) or solar paneling with 12 hour battery pack for LED lighting and shade structure. Attachment 1: Combo Attachment 2: SOW Attachment 3: Sunshade Map TSgt Jeffrey Perkins Alternative