The response deadline has passed. Review the details for future reference or to track similar opportunities.
The Department of Defense is procuring the manufacturing of WAX, REED, which must meet specific material and physical requirements as outlined in the contract. Key requirements include compliance with various military standards for marking and configuration control.
The contractor is responsible for the manufacturing of WAX, REED, ensuring compliance with specified military standards and requirements.
This listing does not include downloadable attachments. The solicitation details may be in the description below.
Verify on SAM.gov|4|N97113A|FAA|771-229-0509|[email protected]| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| STOP-WORK ORDER (AUG 1989)|1|| SPECIAL SHIPPING AND MARKING INSTRUCTIONS|6|X||X|||| GENERAL INFORMATION-FOB-DESTINATION|1|B| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORT (COMBO)|N/A|TBD|N00104|TBD|TBD|SEE SCHEDULE|TBD|N/A|N/A|TBD|N/A|N/A|N/A|N/A|[email protected]| NOTE FOR CONTRACTOR/ADMINISTRATIVE
CONTRACTING OFFICER|3|||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| NOTICE OF CYBERSECURITY MATURITY MODEL CERTIFICATION LEVEL
REQUIREMENTS (NOV 2025))|1|| NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (DEV 2026-O0037)(FEB 2026)|1|| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|||||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| This is not an FMS Requirement/contract. Due to system limitations, the FMS designation could not be removed. Contractor is liable for all shipping expenses to DODAAC location(s) specified within Consignment Instruction notes in contract. GOVERNMENT SOURCE INSPECTION per FAR 52.246-2 IS REQUIRED. DELIVERY_______________DAYS. All contractual documents (i.e. contracts, purchase orders, task orders,delivery orders and modifications) related to the instant procurement areconsidered to be "issued" by the Government when copies are either depositedin the mail, transmitted by facsimile, or sent by other electronic commerce methods, such as email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents asdetailed herein. 1. SCOPE 1.1 This contract/purchase order contains the
requirements for manufacture of the WAX, REED . 2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3.
REQUIREMENTS 3.1 Manufacturing and Design - The WAX, REED furnished under this contract/purchase order shall meet the material and physical
requirements as specified ;on drawing p/n 87070 cage 2W839; . 3.2 Marking - Unless marking
Get matched to contracts like this daily
Free AI-powered contract matching for your business.