Closed
Save

Preventive Maintenance of Emergency Generators

State DepartmentSol: BANDA19BX6026Q0005
$213K

This opportunity is closed

The response deadline has passed. Review the details for future reference or to track similar opportunities.

Quick Brief

The U.S. Government is procuring preventive maintenance services for emergency generators. The key requirements include regular inspections, servicing, and repairs to ensure the generators are operational and compliant with safety standards.

Generated 23d ago

Contract Details

Contract Value
$213K
Similar contracts award $8K to $57K (median $21K, 16,588 awards)Above typical range
NAICS Codes

Agency & Contact

Contracting Organization

Agency
STATE, DEPARTMENT OF

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Published24d ago
Jul 1, 2026
Became Solicitation23d ago
Jul 1, 2026
Tracked
Last Updated22d ago
Jul 3, 2026
Response Due11d ago
Jul 14, 2026

Description

The Contractor shall provide preventive maintenance services for two (2) Cummins diesel generator sets located at the Chancery Compound, including all labor, materials, tools, equipment, consumables, supervision, transportation, insurance, and any other resources necessary to perform the services in accordance with the manufacturer’s warranty

requirements and recommendations. The services shall include maintenance, inspection, testing, adjustment, troubleshooting, and replacement of consumable items as required to ensure the generators and associated equipment remain in proper operating condition. The equipment covered under this requirement includes: One (1) 352DFEH Cummins Diesel Generator Set, 400 KVA, 416/240V, 50Hz, 3-Phase, Wye configuration, including: One (1) OTPC600 Transfer Switch – Onan Cummins, PwrCmd, 600 Amps, 4 Poles; and One (1) Remote Annunciator Panel. One (1) 28DGBB Cummins Diesel Generator Set, 30 KVA, 416/240V, 50Hz, 3-Phase, Wye configuration, including: One (1) OTPC300 Transfer Switch – Onan Cummins, PwrCmd, 300 Amps, 4 Poles; One (1) Remote Annunciator Panel; and One (1) Remote Start Controller Panel. All services shall be performed by qualified personnel in accordance with applicable manufacturer specifications, industry standards, and safety regulations. The Independent Government Cost Estimate (IGCE) for the total potential

period of performance, inclusive of the base year and four (4) one-year option periods, is US$212,660. CHRISTOPHER D PRITCHETT Alternative

Point of Contact Aida Muhamad Contracting , 2201 C ST NW (No Street Address

  • 2) WASHINGTON, DC 20520 USA to this opportunity. FINAL RFQ for Emergency generators 19BX6026Q0005-A0001.pdf
  • SF-30 19BX6026Q0005_RFQ for Emergency Generators PMS.pdf

Get matched to contracts like this daily

Free AI-powered contract matching for your business.