This opportunity is closed. Review the award details to understand pricing and competitors for future similar contracts.
Includes performance of construction contract administration (Critical Path Method Scheduling, submittal management and closeout), multi-discipline efforts involving work on a secure Runway.
Additionally, relevant performance includes performance of multi-discipline efforts involving removal and replacement of 136 individual pavement panels that measure 25 ft wide x 25 ft long x 24 inches deep, located at the intersection of the primary and secondary runway.
Ability to perform work between hours of 2300-0700 hours Thursday through Monday.
The work involves 3 primary activities each night including saw cutting, removal and installation of temporary panels, and placement of permanent panels.
Show ability to construct permanent panels from fast setting concrete, capable of achieving the strength to handle aircraft traffic during a 3 -4-hour cure period.
The runway intersection shall be open for daily aircraft traffic each morning.
Get matched to contracts like this daily
Free AI-powered contract matching for your business.