Closed
Save

Valve Disk

Department of Defense (DoD)Sol: N0010426QTB64

This opportunity is closed

The response deadline has passed. Review the details for future reference or to track similar opportunities.

Attachments

No files on SAM.gov

This listing does not include downloadable attachments. The solicitation details may be in the description below.

Verify on SAM.gov

Contract Details

Awarded Amount
Similar contracts award $893 to $19K (median $5K, 12,165 awards)
NAICS Codes

Agency & Contact

Contracting Organization

Agency
DEPT OF DEFENSE

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Published19d ago
Jul 6, 2026
Became Award Notice18d ago
Jul 6, 2026
Tracked
Last Updated18d ago
Jul 7, 2026
Response Due4d ago
Jul 20, 2026

Description

(JAN 2023)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|COMBO - Receiving Report & Invoice ||TBD|N00104|TBD|TBD|see sked|TBD|||NA|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WSS| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|[email protected]| OPTION FOR INCREASED QUANTITY (MAR 1989)|1|365| CONTRACTOR PURCHASING SYSTEM ADMINISTRATION-BASIC (DEVIATION 2026-O0015)|1|| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|||||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||x| Government source inspection is required. All freight is FOB Origin. - Unit Price:__________ FIRM - Total Price:__________ FIRM - Procurement Turnaround Time (PTAT) :__________ - Awardee CAGE: __________ - Manufacturing Facility CAGE, if not at source:__________ - Packaging Facility CAGE, if not at source: ___________ - Delivery Vehicle (if Delivery Order requested) (if your company has a current BOA/IDIQ, for example) :__________ The resultant award of this solicitation will be issued bilaterally, requiring the contractor's written acceptance prior to execution. Verify nomenclature, part number, and NSN prior to responding. Any contract/order awarded as a result of this solicitation will be a "DO" rated order certified for national defense use under the Defense Priorities and Allocations System (DPAS). See 52.211-14, Notice of Priority Rating for National Defense, Emergency Preparedness, and Energy Program Use. The proposed contract action is for supplies or services for which the Government intends to solicit and negotiate with only one source under the authority of FAR 6.302-1. The Government does not own the data or the rights to the data needed to purchase this part from additional sources. A determination by the Government not to compete with this proposed contract based upon responses to this notice is solely within the discretion of the Government. NAVSUP WSS POC is [email protected] \ 1. SCOPE 1.1 This contract/purchase order contains the

requirements for manufacture and the contract quality

requirements for the DISK,VALVE . 2. APPLICABLE DOCUMENTS 2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.1.1 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 3.

REQUIREMENTS 3.1 Cage Code/Reference Number Items - The DISK,VALVE furnished under this contract/purchase order shall be the design represented by Cage Code(s) reference number(s). Cage _______ ref. no. ;14487 4DP-2889-4; 3.2 Marking - This item shall be physically identified in accordance with ;MIL-STD-130, REV N,

16 NOV 2012; . 3.3 Changes in Design, Material Servicing, or Part Number - Except for a Code 1 change, which shall be processed as provided in the code statement shown below, no substitution of items shall be made until the NAVICP-MECH

Contracting Officer has notified and approval has been given by issuance of a written change order. When any change in design, material, servicing or part number is made to replace or substitute any item to be furnished on this contract/purchase order, the Contractor shall furnish, for the substituting/replacement item, a drawing and an explanation of the reason for the change, explaining the reason therefor. If finished detail drawings are not available, shop drawings in the form used by the manufacturer will be acceptable for Government evaluation. When notifying the Procurement

Get matched to contracts like this daily

Free AI-powered contract matching for your business.