Closed
Save

Building 4 Elevator Replacement at Brockton VA Healthcare Campus

Veterans Affairs (VA)
SDVOSB
est. $156K – $617K

This opportunity is closed

The response deadline has passed. Review the details for future reference or to track similar opportunities.

Quick Brief

The project procures the modernization of two elevators at Building 4 of the Brockton VA Healthcare System Campus in Brockton, MA. Key requirements include the execution of electrical and mechanical work by licensed contractors and compliance with various regulations and codes. The work must be completed within 365 calendar days from the notice to proceed.

Generated 68d ago

Scope & Requirements

The work involves the modernization of existing elevators, including general construction, alterations, and compliance with safety regulations.

Contract Details

Estimated Value
est. $156K – $617K
Similar contracts award $25K$400K (median $99K, 73,582 awards)Within typical range
Period of Performance
365 calendar days
NAICS Codes
Place of Performance
Brockton, MA, USA
Set-Asides
SDVOSB

Qualifications & Eligibility

Set-Aside Category
Service-Disabled Veteran-Owned Small Business (SDVOSB)
Certifications
  • Certified Elevator Technicians (CETs)
  • Qualified Elevator Inspector (QEI)

Agency & Contact

Contracting Organization

Agency
VETERANS AFFAIRS, DEPARTMENT OF
Sub-Agency
VETERANS AFFAIRS, DEPARTMENT OF

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Published2mo ago
Mar 27, 2026
Last Updated2mo ago
Mar 27, 2026
Became Sources Sought2mo ago
Mar 27, 2026
Tracked
Became Solicitation2mo ago
Mar 27, 2026
Tracked
Response Due2mo ago
Apr 6, 2026
Tentative Notice to Proceed1mo ago
May 1, 2026

Description

The Building 4 Elevator Replacement will take place at Building 4 of the Brockton VA Healthcare System Campus in Brockton, MA. The project will consist of Modernization of existing elevators; (1) passenger 3 stop elevator and (1) service 3 stop elevator and associated work necessary to support project. Elevator modernization and associated work. Work includes general construction, alterations, indicators, calls and notification systems, minor site preparation for access and staging and work to support enclosed elevator machine room in existing penthouse. Necessary removal of existing structures and construction and certain other items. The work shall include all demolition and construction necessary to execute the project as defined in the construction documents and as may be implied from the intended use. Removal of regulated building materials shall be conducted in accordance with abatement procedures as per Report (attached). All electrical work necessary for the Modernization of existing elevators must be executed by a Massachusetts licensed electrical contractor. All mechanical work necessary for the Modernization of existing elevators must be executed by a Massachusetts licensed mechanical contractor. All elevators work necessary for the Modernization of existing elevators must be executed by a Massachusetts licensed Class C11 Elevator contractor. The general contractor is responsible for ensuring all technicians involved have Certified Elevator Technicians (CETs) and contractor furnished elevator inspectors possess Qualified Elevator Inspector (QEI) certifications through the ANSI National Accreditation Board and National Association of Elevator Contractors (NAEC). Complete the work within 365 calendar days from the tentative NTP of May 2026. Scope considerations include coordinating with VA Facilities staff, obtaining necessary permits, scheduling work, keeping the site clean, and complying with all applicable regulations and codes. All materials and shop drawings must be approved by the COR, and work must follow Massachusetts DLS regulations and OSHA codes. The

period of performance for the project is 365 Calendar Days. Sean D Genereux Contracting (No Street Address

2) TOGUS, ME 04330 USA to this opportunity. 36C24126Q0250 0001.pdf WAGE DETERMINATION MA20260012.pdf S02 Base Offer Breakdown.xlsx S02-VHA PCRA 2024 1 COR 002.pdf S02 523A5-18-371-Regulated Building Material Survey Report.pdf S02 523A5-18-371-Drawings.pdf S02 523A5-18-371 Specifications.pdf S02 523A5-18-371 SOW.docx

Get matched to contracts like this daily

Free AI-powered contract matching for your business.