Quick Brief

The Central Arkansas Veterans Healthcare System is procuring an upgrade to their pneumatic tube system hardware, specifically the Swisslog nexus panels and ITS position control boards. The contractor will provide all necessary labor, tools, and equipment to install new hardware at two facilities in Little Rock, AR, ensuring proper functionality.

Generated 58d ago

Scope & Requirements

The contractor will upgrade the pneumatic tube system hardware at the Central Arkansas Veterans Healthcare System, including the installation of new nexus panels and control boards at two medical centers.

Deliverables

  • 16 new nexus panels
  • 16 remote personal indicators
  • 34 mini uninterrupted power supplies (UPS)
  • 20 ITS position control boards
  • 1 ITS Configuration kit
  • 8-Port Rocketport Card for each server
  • Communication Interface Assembly for each server

Contract Details

Estimated Value
est. $50K – $200K
Similar contracts award $5K$56K (median $18K, 3,690 awards)Above typical range
NAICS Codes
Place of Performance
Little Rock, AR, USA

Agency & Contact

Contracting Organization

Agency
VETERANS AFFAIRS, DEPARTMENT OF
Sub-Agency
VETERANS AFFAIRS, DEPARTMENT OF
Office
256-NETWORK CONTRACT OFFICE 16 (36C256)

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Published2mo ago
Apr 6, 2026
Last Updated2mo ago
Apr 6, 2026
Became Solicitation2mo ago
Apr 6, 2026
Tracked
Became Presolicitation2mo ago
Apr 6, 2026
Tracked
Response Due2mo ago
Apr 10, 2026
Response Date2mo ago
Apr 13, 202615:00
CDT

Description

5998--Tube System Hardware Upgrade Central Arkansas Veterans Healthcare Sys 5998--Tube System Hardware Upgrade Central Arkansas Veterans Healthcare Sys Sought VETERANS AFFAIRS, DEPARTMENT OF VETERANS AFFAIRS, DEPARTMENT OF -NETWORK CONTRACT (36C256) ND ELECTRONIC ASSEMBLIES, BOARDS, CARDS, AND ASSOCIATED HARDWARE puter Terminal and Other Computer Peripheral Equipment Manufacturing

Place of Performance Department of Veterans Affairs Veterans Health Administration Attachment 1 DRAFT Page 1 of 7 Page 1 of 7 Attachment 1 Page 1 of 7 STATEMENT OF WORK CAVHS - North Little Rock, AR Central Arkansas Veterans Healthcare System (CAVHS) SCOPE The contractor shall provide all labor, tools, equipment, transportation, and supervision necessary to upgrade the Swisslog nexus panels and ITS position Control Boards for Tu s and blowers for the pneumatic tube system in CAVHS NLR FACILITY located at the John L McClellan (JLM) 4300 W. 7TH Street, Little Rock, AR 72205 and at the North Little Rock Eugene Towbin VA Medical Center located at 2200 Ft Roots Drive, Bldg. 170, North Little Rock, AR 72114. Swisslog panel/control board upgrade/install will consist of the following: 16 new nexus panels installed for tube system located at CAVHS North Little Rock. 16 remote personal indicators installed located at CAVHS North Little Rock 34 mini uninterrupted power supplies (UPS) installed at CAVHS North Little Rock. 20 ITS position control boards for TU s and blowers installed at CAVHS North Little Rock. 1 ITS Configuration kit installed at CAVHS North Little Rock. An 8-Port Rocketport Card for each of the new servers. A communication Interface Assembly for each of the new servers. Installation by a Swisslog Healthcare Field Service Engineer for all hardware. Ensure new hardware is working properly at both JLM and North Little Rock CAVHS campuses. GENERAL GUIDANCE Upgrade the tube system hardware on all panels, tu s, and blowers at both campuses CAVHS NLR FACILITIES] located at the North Little Rock Eugene Towbin VA Medical Center located at 2200 Ft Roots Drive, Bldg. 170, North Little Rock, AR 72114. WORK HOURS: All work pertaining to this contract will need to be performed Monday thru Friday unless a Federal holiday falls on one of these days. The time frame will be whatever is needed to work around the different service schedule. Most of the work could be done between 8am to 4pm. Some work outside of normal hours of operations may be necessary (i.e. Electrical) must be coordinated with the project

Contracting Officer Representative (COR). On the days listed below delivery shall not be scheduled unless unique situations arrive and prior approval between the contractor and CAVHS parties involved is agreed upon. GOVERNMENT PERSONNEL OBSERVED HOLIDAYS: The Government hereby provides notice and Contractor hereby acknowledges receipt that Government personnel observe the listed days as holidays: New Year's Day Martin Luther King's Birthday President's Birthday Memorial Day Juneteenth Independence Day Labor Day Columbus Day Veterans Day Thanksgiving Day Christmas 4.2. In addition to the days designated as holidays, the Government observes the following days: Any other day designated by Federal Statute Any other day designated by Executive Order Any other day designated by the President s Proclamation GENERAL

REQUIREMENTS Contractor shall maintain the equipment in accordance with manufacturer s standards. CHANGES TO THE STATEMENT OF WORK The CO is the only individual authorized to approve changes or modify any of the

requirements under this contract. The Contractor shall communicate with the

Contracting Officer s Representative (COR) on all matters pertaining to contract administration. The COR is designated to represent the