The response deadline has passed. Review the details for future reference or to track similar opportunities.
The Department of Defense is procuring nozzles for the Navy, specifically for the NAVSUP Weapon Systems Support in Mechanicsburg. Key requirements include compliance with higher-level contract quality requirements and government source inspection.
The contract includes the manufacture of nozzles, with specific requirements for quality and inspection.
This listing does not include downloadable attachments. The solicitation details may be in the description below.
Verify on SAM.gov|4|N97113A|FAA|771-229-0509|[email protected]| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|6|ISO9001|||||| SPECIAL SHIPPING AND MARKING INSTRUCTIONS|6|X||X|||| GENERAL INFORMATION-FOB-DESTINATION|1|B| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORT (COMBO)|N/A|TBD|N00104|TBD|TBD|SEE SCHEDULE|TBD|N/A|N/A|TBD|N/A|N/A|N/A|N/A|[email protected]| NOTE FOR CONTRACTOR/ADMINISTRATIVE
CONTRACTING OFFICER|3|||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (DEV 2026-O0040)(FEB 2026)|4||||| NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (DEV 2026-O0037)(FEB 2026)|1|| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| SMALL BUSINESS PROGRAM REPRESENTATIONS (DEV 2026-O0037)(FEB 2026)|20||||||||||||||||||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| CERTIFICATION REGARDING KNOWLEDGE OF CHILD LABOR FOR LISTED END PRODUCTS(FEB 2021))|4||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| TO VIEW THE DRAWINGS: Go to www.https://www.sam.gov/ Click: Contract Opportunities and enter the solicitation number This gives you access to the Electronic Solicitation.Drawings can be viewed or downloaded.GOVERNMENT SOURCE INSPECTION per FAR 52.246-2 IS REQUIRED. DELIVERY_______________DAYS. All contractual documents (i.e. contracts, purchase orders, task orders,delivery orders and modifications) related to the instant procurement areconsidered to be "issued" by the Government when copies are either depositedin the mail, transmitted by facsimile, or sent by other electronic commercemethods, such as email. The Government's acceptance of the contractor'sproposal constitutes bilateral agreement to "issue" contractual documents asdetailed herein. 1. SCOPE 1.1 This contract/purchase order contains the
requirements for manufacture of the NOZZLE . 2. APPLICABLE DOCUMENTS 2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.1.1 Documents, drawings, and publications supplied are listed under "Drawing Number". These items should be retained until an award is made. 2.1.2 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 2.1.3 The "Document Changes" section provides supersessions/changes to referenced documents. 2.2 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the drawings shall take precedence. Nothing in this contract/purchase order, however, shall supersede applicable laws and regulations unless a specific exemption has been obtained. DRAWING DATA=3003051 |10001| A| |D|0001 | A|49998|0113553 DRAWING DATA=3003051 |10001| A|PL |D|0001 | A|49998|0150220 DRAWING DATA=40586 |10001| 5|OD |D|0000.COV | 5|49998|0029367 DRAWING DATA=40586 |10001| 5|OD |D|0000.COV1 | 1|49998|0019220 DRAWING DATA=40586 |10001| 5|OD |D|0000.COV2 | 2|49998|0018513 DRAWING DATA=40586 |10001| 5|OD |D|0000.COV3 | 5|49998|0015189 DRAWING DATA=40586 |10001| 5|OD |D|0000.COV4 | 5|49998|0015847 DRAWING DATA=40586 |10001| 5|OD |D|0000.COV5 | 5|49998|0014012 DRAWING DATA=40586 |10001| 5|OD |D|0000.II | 5|49998|0010772 DRAWING DATA=40586 |10001| 5|OD |D|0000.III | -|49998|0020051 DRAWING DATA=40586 |10001| 5|OD |D|0000.IV | 5|49998|0006122 DRAWING DATA=40586 |10001| 5|OD |D|0000.V | 5|49998|0028625 DRAWING DATA=40586 |10001| 5|OD |D|0001.1 | 5|49998|0029227 DRAWING DATA=40586 |10001| 5|OD |D|0001.2 | 5|49998|0010513 DRAWING DATA=40586 |10001| 5|OD |D|0002.1 | 5|49998|0014058 DRAWING DATA=40586 |10001| 5|OD |D|0003.1 | 5|49998|0021753 DRAWING DATA=40586 |10001| 5|OD |D|0003.2 | 5|49998|0017993 DRAWING DATA=40586 |10001| 5|OD |D|0003.3 | 5|49998|0019145 DRAWING DATA=40586 |10001| 5|OD |D|0003.4 | 5|49998|0015872 DRAWING DATA=40586 |10001| 5|OD |D|0003.5 | 5|49998|0008718 DRAWING DATA=40586 |10001| 5|OD |D|0004.1 | 5|49998|0023436 DRAWING DATA=40586 |10001| 5|OD |D|0004.2 | 5|49998|0020275 DRAWING DATA=40586 |10001| 5|OD |D|0004.3 | 5|49998|0009315 DRAWING DATA=40586 |10001| 5|OD |D|0005.1 | 5|49998|0022601 DRAWING DATA=40586 |10001| 5|OD |D|0005.2 | 5|49998|0021414 DRAWING DATA=40586 |10001| 5|OD |D|0005.3 | 5|49998|0023590 DRAWING DATA=40586 |10001| 5|OD |D|0005.4 | 5|49998|0023809 DRAWING DATA=40586 |10001| 5|OD |D|0005.5 | 5|49998|0019218 DRAWING DATA=40586 |10001| 5|OD |D|0005.5A1 | 5|49998|0008899 DRAWING DATA=40586 |10001| 5|OD |D|0005.5A2 | 5|49998|0037702 DOCUMENT REF DATA=O-F-499 | | |D |910220|A| | | DOCUMENT REF DATA=QQ-B-654 | | |A |910207|A| 1| | DOCUMENT REF DATA=ASTM-B280 | | | |931215|A| | | DOCUMENT REF DATA=AWS-C3.4 | | | |960917|A| | | DOCUMENT REF DATA=MIL-DTL-31000 | | |C |040709|A| | | DOCUMENT REF DATA=A-A-59445 | | | |040330|A| | | DOCUMENT CHANGE DATA=MIL-B-7883 |AWS-C3.4 DOCUMENT CHANGE DATA=MIL-D-1000 |MIL-DTL-31000 DOCUMENT CHANGE DATA=MS35921 |A-A-59445 DOCUMENT CHANGE DATA=WW-T-775 |ASTM-B280 3.
REQUIREMENTS 3.1 Manufacturing and Design - The NOZZLE furnished under this contract/purchase order shall meet the material and physical
requirements as specified ;part number 3003051 cage 10001; . 3.2 Marking - Unless marking
requirements are specified by a document or drawing cited in this solicitation all items delivered under this contract/purchase order shall be marked and identified in accordance with the applicable Military Standards and Specifications as follows: Mechanical Parts, Assemblies and Equipments - MIL-STD-130 Electrical and Electronic Parts - MIL-STD-1285, Method 1. Electrical and Electronic Parts and Assemblies not covered by MIL-STD-1285-use MIL-STD-130. Electronic Equipment - MIL-STD-454 Requirement Number 67. Electrical Equipment - MIL-P-15024/5 (SHIPS) 3.3 Configuration Control - MIL-STD-973 entitled "Configuration Management", Paragraph 5.4.8, Configuration Control (Short Form Procedure), is hereby incorporated. The Contractor shall submit all Engineering Change Proposals in accordance with MIL-STD-973, Paragraph 5.4.8.2 and Appendix
Get matched to contracts like this daily
Free AI-powered contract matching for your business.