ActiveSources Sought
Save

Driveway and Stormwater Drainage Rehabilitation in Canberra, Australia

State Department
est. $45K – $120K

This is a Sources Sought notice

The agency is researching potential vendors before issuing a formal solicitation. Responding shows your capabilities and can influence the final RFP.

Quick Brief

The Department of State is procuring rehabilitation services for the Deputy Chief of Mission Residence driveway and stormwater drainage in Canberra, Australia. Key requirements include stormwater drainage investigation, asphalt pavement replacement, subgrade rehabilitation, and full site restoration. The contractor must provide all necessary labor, materials, and equipment to complete the project as specified.

Generated 6h ago

Can you respond to this?

Get your fit score, win probability, and required capabilities.

Fit Score7/10Consider

Scope & Requirements

The work involves rehabilitation of the driveway and stormwater drainage system at the Deputy Chief of Mission Residence.

Contract Details

Estimated Value
est. $45K – $120K
Similar contracts award $10K to $99K (median $32K, 1,971 awards)Within typical range
NAICS Codes
Place of Performance
Canberra, Australia

Agency & Contact

Contracting Organization

Agency
STATE, DEPARTMENT OF

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Publishedyesterday
Jul 23, 2026
Last Updatedyesterday
Jul 23, 2026
Became Solicitationtoday
Jul 23, 2026
Tracked
Became Special Noticetoday
Jul 23, 2026
Tracked
Became Award Noticetoday
Jul 23, 2026
Tracked
Response Duein 4d
Jul 28, 2026
Response Datein 13d
Aug 6, 202617:00
GMT+10

Description

DCMR Driveway and Stormwater Drainage Rehabilitation. Work includes stormwater drainage investigation, repair, and upgrade; full removal and replacement of deteriorated asphalt pavement (minimum 50 mm compacted thickness); subgrade and base course rehabilitation; replacement of existing stone edging with 150 mm concrete kerbs; entrance apron asphalt works; and full site restoration of landscaping, irrigation, lighting, and utilities. The contractor shall furnish all labor, materials, equipment, and miscellaneous costs required to complete the installation as specified herein.. Please refer to Section B for the detailed Statement of Work. Malenereynee Carr Alternative

Point of Contact Paul Rau Contracting , 2201 C ST NW (No Street Address

2) WASHINGTON, DC 20520 USA to this opportunity. RFQ 19AS2026Q0020 DCMR Driveway and Stormwater Drainage Rehabilitation.pdf Attachment 1.

Get matched to contracts like this daily

Free AI-powered contract matching for your business.