The response deadline has passed. Review the details for future reference or to track similar opportunities.
The Department of Defense is procuring the replacement of service and emergency gates at Bear Creek Dam in Lakewood, Colorado. The project involves fabricating and installing new gates, repainting existing structures, and replacing hydraulic components, with detailed specifications provided in the attached documents.
The work includes fabricating and installing new service and emergency gates, repainting existing structures, and replacing hydraulic components at Bear Creek Dam.
The work includes fabricating and installing new service gates and emergency gates to fit current gate slots at Bear Creek Dam, Lakewood, Colorado. The gate slots must be measured for accuracy and the existing drawings shall be used for information only. The inlet tunnel liner, gate slots, and marine door will be repainted. The work related to the main hydraulic gate hoist system will be limited to the replacement of bonnet gaskets and O-ring seals between the gate stem and the new gate. The hydraulic oil piping for the low-flow gate, between the new cylinder and the flexible hoses on the hoist deck, will also be replaced. The low-flow gate cylinders will be redesigned, fabricated, shop-tested, and installed to operate the low-flow gates on the new service gates. All incidental related work is also included in this scope. Mechanical
scope of work is illustrated on drawing sheets M-001 thru M-105 and detailed
requirements are specified in specification sections 05 56 09.00 26 GATE SEALS and 35 05 40.14 10 HYDRAULIC HOISTING SYSTEMS FOR CIVIL WORKS STRUCTURES. SEE ALL
ATTACHMENTS Mika N. Mahyenga Alternative
Point of Contact Tony Manna to this opportunity. W9128F26RA079.pdf W9128F26RA079- Bear Creek Service and Emergency Gates Replacement_Site Visit Info.pdf W9128F26RA079 Bear Creek Gate Rehab Specs.pdf
Get matched to contracts like this daily
Free AI-powered contract matching for your business.