Closed
Save

Remove Traffic Island and Build Sloped Concrete Display

Department of Defense (DoD) > U.S. ArmySol: W50S6T26QA026
SDVOSBFFP
$25K

This opportunity is closed

The response deadline has passed. Review the details for future reference or to track similar opportunities.

Quick Brief

The Department of Defense is procuring the removal of a traffic island and the construction of sloped concrete sides for a static F-15 heritage aircraft display. The project includes demolishing the existing traffic island, repairing irrigation, and repaving the area with a smooth surface, with a total value of less than $25000. This opportunity is set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB).

Generated 30d ago

Scope & Requirements

The contractor will remove a traffic island and construct sloped concrete sides for a static aircraft display, including necessary repairs and repaving.

Contract Details

Contract Typei
FFP
Contract Value
$25K
Similar contracts award $32K to $473K (median $130K, 7,685 awards)Below typical range
NAICS Codes
Set-Asides
SDVOSB

Qualifications & Eligibility

Set-Aside Category
SDVOSB
Required Registrations
  • DBIDS

Agency & Contact

Contracting Organization

Agency
DEPT OF DEFENSE
Sub-Agency
DEPT OF THE ARMY NATIONAL GUARD BUREAU

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Site Visit2y ago
Jun 25, 202409:00
Not mandatory but strongly recommended.
Published1mo ago
Jun 24, 2026
Became Award Notice1mo ago
Jun 24, 2026
Tracked
Became Sources Sought1mo ago
Jun 24, 2026
Tracked
Became Solicitation1mo ago
Jun 24, 2026
Tracked
Last Updated1mo ago
Jun 25, 2026
Response Due7d ago
Jul 17, 2026

Description

This project is to construct sloped concrete sides around an existing raised pedestal for a static F-15 heritage aircraft display. In addition to the pedestal, the contractor will demolish and remove the traffic island located in front of the West Gate guard shack, repair the underlying irrigation, and repave the area. The final surface will be smooth and seamless. The magnitude of this requirement is less than $25,000 Request for Quote (RFQ) details are provided on the attached solicitation. This requirement is being solicited as a Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside. Review the RFQ solicitation instructions for quote submission criteria. Quotes shall be submitted electronically to the following email addresses: [email protected]; [email protected] A site visit is tentatively scheduled for Thursday 25 June at 0900 PDT. The designated rally point will be the west gate visitor parking lot. Parking space is limited therefore carpooling is strongly advised. To be granted base access, Offerors must complete Defense Biometric Identification System (DBIDS) Prequalification and submit a base access form. Complete all fields under the CONTRACTOR/VENDOR/VISITOR INFORMATION section consisting of attendee names, citizenship, and DBIDS code (6-digit code). The base access form must be provided 5 business days before the site visit. Refer to Attachment, Base Access Request for additional instructions.

Questions will be accepted until seven days prior to solicitation response deadline. The site visit is not mandatory but strongly recommended. Offerors are responsible for verifying conditions at the project site. As required by 15 U.S.C. § 644(w), implemented by RFO FAR 36.101-4, the following information is provided to interested small businesses: (A). The National Guard Bureau (NGB) has no agency-specific policies or procedures applicable to definitization of equitable adjustments for change orders under construction contracts, other than those described at FAR 43.204, DFARS 243.204 and Army FAR Supplement (AFARS) 5143.204. (B). Data for the prior 3 fiscal years regarding the time required to definitize equitable adjustments for change orders under construction contracts for the NGB is currently unavailable, however data for Department of the Army (which NGB reports to) is listed below: Selected Agency: DEPT OF THE ARMY Time to definitize after receipt of an adequate Change Order Definitization Proposal under Construction Contracts: Number of Change Order Proposals definitized under Construction Contracts 30 days or less: 0 31 to 60 days: 1 61 to 90 days: 0 91 to 180 days: 0 181 to 365 days: 1 Greater than 365 days: 1 After completion of contract performance via a contract modification addressing all un-definitized equitable adjustments received during contract performance 2 Justin Scales Alternative

Point of Contact Jarrod Sanchez to this opportunity. Statement of Work v2.1 HAYW 26-2017 Static Display Concrete and Traffic Island Removal.pdf Base Access Request - 144 SFS DVES FORM (20240320).pdf Statement of Work v2.1 HAYW 26-2017 Static Display Concrete and Traffic Island Removal.pdf (deleted) Solicitation Amendment - W50S6T26QA0260001 Professional Appearance.pdf Wage Determination CA20260018 Rev 5

18 May 2026.pdf Technical Factors 26QA26.1.pdf

Get matched to contracts like this daily

Free AI-powered contract matching for your business.