The response deadline has passed. Review the details for future reference or to track similar opportunities.
The Department of Homeland Security is procuring insulation covers for the Gas Turbine Bleed Air Hose on the USCGC Munro, which is currently non-operational due to damaged insulation. The contractor will manufacture new removable insulation covers to specified dimensions and standards, with the goal of returning the vessel to fully mission capable status as soon as possible.
The contractor will replace insulation covers on the Gas Turbine Bleed Air Hose to ensure the operational capability of the USCGC Munro.
this solicitation was to correct the POP in the attached SOW. Correct:
period of performance for this contract shall be between 01JUL2026 & 15JUL26. STATEMENT OF WORK (SOW) FOR GAS TURBINE BLEED AIR HOSE INSULATION CGC MUNRO has a need to replace insulation covers on the Gas Turbine Bleed Air Hose. The ship’s Main Gas Turbine is currently non-operational and has an immediate need for new insulation materials as outlined in this Statement of Work (SOW). 1.0 GENERAL
Background USCGC MUNRO inadvertently soaked the insulation surrounding GTBA-HOSE-1 with an oily water. The hose is for the anti-icing bleed air system located underneath the Main Gas Turbine Module. Inundated insulation causes smoking when the Gas Turbine is operated in external temperatures above 40 degrees; preventing operation of the turbine. Scope The scope of this contract is defined by the efforts and tools required to support USCGC MUNRO (WMSL 755). The Contractor shall manufacture new removeable insulation covers to the dimensions and specs provided.
OBJECTIVE The goal is to return CGC MUNRO to Fully Mission Capable (FMC) status. This is a critical need and shall be completed as soon as possible, in order to minimize negative operational impact to MUNRO’s Operational Commander. APPLICABLE DOCUMENTS Reference Documents The following documents may be helpful to the Contractor in performing the work described in this document: Coast Guard Drawing (CGDWG) 750-WMSL-508-001, Rev C, JUNE 2009, Piping And Machinery Insulation Schedule And L/M (ASC508001) Coast Guard Drawing (CGDWG) 750-WMSL-259_023, Rev C, OCTOBER 2014, Bleed Air Piping & Joint Ident (P1 System) Unit 2210 SPECIFIC
REQUIREMENTS/TASKS Existing insulation cover dimensions are as follows: Length Width Thickness Inner Layer 34” 22” 2” Outer Layer 45” 28” 2” Fabrication of reusable covers shall comply with ASTM F683-99, PARA 8, PAGE 8. For temperature 450 degrees Fahrenheit and over the covers shall be made up of layers of glass fiber felt to make up the required thickness. The inside and ends shall be wrapped with knitted wire mesh or fibrous glass cloth “wire-inserted”. The outside shall be covered with fibrous glass cloth. Covers shall be sewn and quilted with thread to provide a uniform thickness, strength and ridigity. 3.0 OTHER APPLICABLE CONDITIONS 3.1
Get matched to contracts like this daily
Free AI-powered contract matching for your business.