Touchdown 08 Airfield Pavement Repair And Replacement

Department of Defense (DoD) > U.S. Army > Southwestern Division, Middle East DistrictSol: W912ER26RA014-PSN
FFP
est. $100K – $500K

This opportunity is closed

The response deadline has passed. Review the details for future reference or to track similar opportunities.

Quick Brief

The Department of Defense is procuring construction services for the Touchdown 08 Airfield Pavement Repair and Replacement project in Jordan. The work involves replacing existing concrete and asphalt pavement, extending the runway, and ensuring compliance with ICAO standards, along with designing foundational structures for Aircraft Arresting System Absorber Shelters. The anticipated period of performance is 540 calendar days after the notice to proceed.

Generated 16d ago

Scope & Requirements

The project involves comprehensive pavement repair and replacement of concrete and asphalt at an airfield in Jordan, including runway extension and compliance with international aviation standards.

Evaluation Criteria

  1. Cybersecurity Accreditation
  2. Controlled Unclassified Information (CUI) Data Management

Contract Details

Contract Typei
FFP
Estimated Value
est. $100K – $500K
Similar contracts award $32K$465K (median $129K, 8,020 awards)Within typical range
Period of Performance
540 calendar days
NAICS Codes
Place of Performance
Jordan

Agency & Contact

Contracting Organization

Agency
DEPT OF DEFENSE
Sub-Agency
U.S. Army Corps of Engineers
Office
Southwestern Division, Middle East District

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Published17d ago
May 18, 2026
Became Solicitation16d ago
May 18, 2026
Tracked
Became Presolicitation16d ago
May 18, 2026
Tracked
Last Updated15d ago
May 20, 2026
Anticipated RFP Release Date3d ago
Jun 1, 202615:00
Response Due2d ago
Jun 1, 2026

Description

for Touchdown 08 Airfield Pavement Repair and Replacement Kingdom of Jordan W912ER26RA014. Update: The Government is actively preparing the Phase I RFP, which has an anticipated release date of

01 June 2026. Once published, the solicitation will provide complete details regarding the required Responsibility Determination and two information security based evaluation factors: Cybersecurity Accreditation and Controlled Unclassified Information (CUI) Data Management. The U.S. Army Corps of Engineers (USACE), through its Southwestern Division, Middle East District (SWM), anticipates soliciting and awarding a contract to provide the necessary construction services as described below. The project site is located at an undisclosed location, East of Amman, Jordan. : Z2BD ? Repair or Alternation of Airport Runways and Taxiways. NAICS Code: 237310 ? Highway, Street, and Bridge Construction. This project is a Firm-Fixed Price (FFP) Design-Bid-Build (DBB) contract awarded based on full and open competition using the best value trade off source selection procedures in accordance with Revolutionary Federal Acquisition Regulation (FAR) Overhaul (RFO) Part 15 - Contracting by Negotiation and RFO Part 36- Construction and Architect Engineer Contracts. No reimbursement will be made for any costs associated with providing information in response to this notice, the forthcoming Request for Proposal (RFP) or any future follow-up information requests. The Middle East District is evaluating the ability of businesses to perform a comprehensive pavement repair and replacement of concrete pavement at an undisclosed location in the Hashemite Kingdom of Jordan. The main effort requires replacing 13,504 Square Meters (SM) of Portland Cement Concrete (PCC) pavement and 13,354 SM of asphalt with new, modified-heavy load concrete to extend the touchdown zone of the Runway. This work, which must comply with International Civil Aviation Organization (ICAO) standards, includes replacing associated lighting and markings. A secondary part of the scope is design-after-award work for which the contractor will design and construct the foundational structure for the Aircraft Arresting System (AAS) Absorber Shelters. The selected firm must have the capability to perform Civil Works, specifically earthwork, runway construction or repair in the Kingdom of Jordan. Project technical specifications, drawings, etc. will be posted as

attachments to the RFP. All responsible sources are encouraged to submit a timely and complete proposal in response to the forthcoming RFP, which will be considered by the agency. Performance Period: The anticipated

period of performance is 540 calendar days after issuance of the notice to proceed.

Attachments: This notice does not include any

attachments. Points of Contact: The points of contact for this notice are Jerry O. Andes II at [email protected] or (540) 665-3777 and Diane E. deLathouder at [email protected] or (540) 665-3615. Diane deLathouder Phone Number (540) 665-3615 Alternative