The response deadline has passed. Review the details for future reference or to track similar opportunities.
The Air Force is seeking a form, fit, and function replacement for the Fourth Gen Rocket Motor Semitrailer (RMS4) to support the Minuteman III ICBM. The replacement must meet specific requirements and provide a temperature-controlled environment for transporting rocket motor stages.
The RMS4 provides transportation of MMIII Stage 1, Stage 2, and Stage 3 solid boosters, ensuring minimal shock and vibration and maintaining temperature control.
------- ATTENTION // OPENING UP FOR ROUND #3 OF RFI in BOLD below // RESPONSE REQUESTED. --------- 3/9/2026 AGENCY/ORGANIZATION: Department of the Air Force, Air Force Materiel Command, AFNWC/NIMT WEAPON SYSTEM: Minuteman III (MMIII) Intercontinental Ballistic Missile (ICBM) IPT: Ground Mechanical RFI PURPOSE: This RFI provides notice that the RMS4 program team is currently evaluating the availability and manufacturability of a form, fit, and function replacement. The form, fit, function RMS4 replacement must meet the
requirements in Attachment 1. General
Requirements RMS4. NOTICE: This notification is for market research purposes only to identify potential contractors who have the skills, experience, and knowledge required to successfully complete this effort for the RMS4 effort and is not to be construed as a solicitation. The issuance of this RFI and responses thereto do not imply a commitment to release a solicitation. A determination by the Government not to compete any or all portions of the work discussed in this RFI rests solely within the discretion of the Government. The Government will not pay for time, effort, materials, or any other costs that arise as a consequence of responding or providing information related to this RFI. The purpose of this Sources Sought Synopsis is to conduct market research to determine if responsible sources exist and if this effort can be competitive and/or a total Small Business Set-Aside. The proposed North American Industry Systems (NAICS) Code is intended to be 336212 or 336999 which have a corresponding size standard of 1,000 or fewer employees. The Government will use this information to determine the best acquisition strategy for this procurement. The Government is interested in all small business, to include 8(a), Service-Disabled Veteran-Owned, historically underutilized business zone (Hubzone), and Women-Owned small business concerns.
BACKGROUND: The Air Force’s (AF) fleet of RMS must support the MMIII LGM-30G ICBM until the end of its operational life. However, the existing challenge of parts obsolescence poses a significant obstacle to providing seamless support. Additionally, a scarcity of spare parts, some entirely unobtainable, coupled with substantial engineering updates required by the Technical Data Package (TDP), further complicates the situation. Given these considerations, the AF aims to develop a new design, create a new TDP, and ultimately increase the RMS fleet. Procurement of 16 RMS4, including one to two RMS4 during the Engineering, Manufacturing, and Development (EMD) phase, will be required. During Production, the AF expects to procure the remaining 14 or 15 RMS4 for a total of 16. RMS DESCRIPTION: The RMS provides transportation of MMIII Stage 1, Stage 2, and Stage 3 solid boosters or select combinations of individual stages, herein referred to as the Boosters, loaded into the Stage 1, Stage 2, and Stage 3 Operational Rocket Motor Carriages. The RMS provides a transportation platform that limits excessive shock and vibration to the Boosters. It also provides a temperature-controlled environment designed to keep the Boosters within their required temperature range during transportation. The Environmental Control Unit provides the required temperature control by use of an on-board diesel fueled generator and a closed loop Heating Ventilation and Air Conditioning unit. /////////////////////////// RFI # 3 BELOW //////////////////// INFORMATION SOUGHT: Provide a detailed overview of your company's sub-contractor management plan. This plan should address, at a minimum, your procedures for: Requirement Compliance: How do you ensure sub-contractors adhere to all contractual and project-specific
requirements? Performance Management: What metrics and processes do you use to monitor and evaluate sub-contractor performance in meeting cost, schedule, and technical
requirements? Specialized Processes: How do you oversee and ensure the quality of specialized work, such as welding, performed by sub-contractors? Integration: How do you plan to ensure comprehension of technical
Get matched to contracts like this daily
Free AI-powered contract matching for your business.