Closed
Save

Turnkey Additive Manufacturing Solution for 3D Printers

Department of Defense (DoD)Sol: W56ZLW26Q0019

This opportunity is closed

The response deadline has passed. Review the details for future reference or to track similar opportunities.

Contract Details

Value
Similar contracts award $497 to $28K (median $5K, 2,574 awards)
NAICS Codes

Agency & Contact

Contracting Organization

Agency
DEPT OF DEFENSE

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Published18d ago
Jul 7, 2026
Became Sources Sought17d ago
Jul 7, 2026
Tracked
Last Updated15d ago
Jul 9, 2026
Response Due9d ago
Jul 15, 2026

Description

This requirement is for a turnkey additive manufacturing solution to establish an organic capability for producing replacement parts at Fort Hood, TX. The acquisition includes two specific industrial-grade 3D printers, along with all necessary services for immediate and sustained operation: - Stratasys Origin Two (Polymer Printer): An industrial-grade 3D printer utilizing programmable photopolymerization (P3/DLP) technology. It must have a minimum build volume of 192 mm x 108 mm x 370 mm and be capable of producing high-accuracy end-use parts with complex geometries. - Stratasys F370CR (Composite-Ready Printer): An industrial-grade Fused Deposition Modeling (FDM) 3D printer specifically designed for producing composite parts. It must have a minimum build volume of 355 x 254 x 355 mm and be capable of printing with high-strength, carbon fiber-reinforced thermoplastics. The requirement also includes turnkey installation, configuration, and calibration of all equipment; manufacturer-led on-site training for operators; all necessary software licenses and initial consumables; and a comprehensive warranty and technical support package. Training shall be scheduled and conducted only after the printer has been fully installed, calibrated, and verified as operational. Training includes but not limited to system operation, job setup, maintenance, and troubleshooting. All

questions must be submitted in writing to the POCs listed below no later than 04:00 pm (CST),

9 July 2026. [email protected] [email protected] Austin Sanderson Alternative

Point of Contact Komlan Dougah to this opportunity. 3D Printer_RFO MFR_Limiting_Competition_under_SAT_Redacted.pdf

Get matched to contracts like this daily

Free AI-powered contract matching for your business.