ActiveOpen for Bids
Save

Repair and Replace Mass Parking Apron Section V

Department of Defense (DoD) > U.S. Army > Engineer Division Northwestern District OmahaSol: W9128F26RA107
SB
$32K – $473K per task order
Quick Brief

The Department of Defense is procuring the repair and replacement of the Mass Parking Apron Section V at Minot Air Force Base in North Dakota. This project involves removing and replacing the entire Mass Parking Apron in multiple sections, ensuring a uniform width and improving surface drainage. The estimated construction cost ranges from $25,000,000 to $35,000,000 and is restricted to small businesses.

Generated 1d ago

Can you win this contract?

Get your fit score, win probability, and required capabilities.

Fit Score7/10Consider

Scope & Requirements

The project involves the design-bid-build execution of the Mass Parking Apron replacement, ensuring uniformity in width and addressing drainage issues.

Contract Details

Contract Value
$32K – $473K per task order
IDIQ ceiling: $35M
Similar contracts award $32K to $473K (median $130K, 7,680 awards)
NAICS Codes
Place of Performance
Minot, North Dakota, USA
Set-Asides
SB

Qualifications & Eligibility

Set-Aside Category
Small Business

Agency & Contact

Contracting Organization

Agency
DEPT OF DEFENSE
Sub-Agency
US Army Corps of Engineers
Office
Engineer Division Northwestern District Omaha

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Published3d ago
Jul 21, 2026
Became Solicitation2d ago
Jul 21, 2026
Tracked
Last Updatedtoday
Jul 23, 2026
Response Duein 28d
Aug 20, 2026

Description

This project will be executed using a design-bid-build project delivery method. The entire Mass Parking Apron will be removed and replaced in multiple sections over the course of several years. The existing MPA was originally constructed under two separate contracts. For unknown reasons, the first constructed eastern half is 5 ft narrower than the western half south of the MPA centerline taxiway (335 ft vs. 340 ft). This project will establish a uniform MPA width of 340 ft south of the MPA centerline taxiway. Due to slight changes in finished top of pavement grades between the new MPA Section(s) pavement and the existing MPA pavement to remain, a new temporary ACC transition will be required to connect new MPA Section(s) PCC pavement to existing MPA PCC pavement. Limited grading of turf areas adjacent to new ACC shoulder pavement to improve surface drainage away from paved shoulder edges (Provide 1-1/2 inch drop-off at edge per UFC 3-260-01, Chapter 6). Existing asphalt shoulders required to be removed will be milled by the Contractor and stockpiled for Minot AFB use at a later date at the location shown on the drawings. Estimated Construction Costs: The estimated construction cost of this project is between $25,000,000 and $35,000000. Shayna Zeleznik Alternative

Point of Contact Jessica Beckman