The Department of Defense is procuring the repair and replacement of the Mass Parking Apron Section V at Minot Air Force Base in North Dakota. This project involves removing and replacing the entire Mass Parking Apron in multiple sections, ensuring a uniform width and improving surface drainage. The estimated construction cost ranges from $25,000,000 to $35,000,000 and is restricted to small businesses.
Get your fit score, win probability, and required capabilities.
The project involves the design-bid-build execution of the Mass Parking Apron replacement, ensuring uniformity in width and addressing drainage issues.
This project will be executed using a design-bid-build project delivery method. The entire Mass Parking Apron will be removed and replaced in multiple sections over the course of several years. The existing MPA was originally constructed under two separate contracts. For unknown reasons, the first constructed eastern half is 5 ft narrower than the western half south of the MPA centerline taxiway (335 ft vs. 340 ft). This project will establish a uniform MPA width of 340 ft south of the MPA centerline taxiway. Due to slight changes in finished top of pavement grades between the new MPA Section(s) pavement and the existing MPA pavement to remain, a new temporary ACC transition will be required to connect new MPA Section(s) PCC pavement to existing MPA PCC pavement. Limited grading of turf areas adjacent to new ACC shoulder pavement to improve surface drainage away from paved shoulder edges (Provide 1-1/2 inch drop-off at edge per UFC 3-260-01, Chapter 6). Existing asphalt shoulders required to be removed will be milled by the Contractor and stockpiled for Minot AFB use at a later date at the location shown on the drawings. Estimated Construction Costs: The estimated construction cost of this project is between $25,000,000 and $35,000000. Shayna Zeleznik Alternative
Get matched to contracts like this daily
Free AI-powered contract matching for your business.